BLD-Final | 5/23/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Dave Hannah
|
|
|
Marty Phone #: ###-#### (please verify if plumbing signature required for CO//leg) (per David H on the phone, plumbing signature is a N/A-TCH)
|
FIRE-Final Inspection | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is comlpete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Marty Phone #: ###-####
|
BLD-Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | NR |
Dave Hannah
|
|
|
Marty Phone #: ###-####
|
FIRE-Final Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | FAIL |
Jim Page
|
|
|
Fire alarm work was completed without an issued permit, fire alarm modifications will need to be permitted, inspected and finaled before life fire safety inspection can be completed.
Marty Phone #: ###-####
|
FIRE-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler inspection failed due to a painted head and texture mud all the way up to the base of the sprinkler head. An FIR permit is required for fire alarm work, currently there is a wall mounted device mounted on the ceiling, was informed by the GC that the devices were lowered from their original location, any modifications to the fire alarm system requires a permit, including lowering devices from the original location.
Marty Phone #: ###-####
|
BLD-Framing/Rough-in | 4/26/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
Marty Phone #: ###-####
|