Permit Information
Permit NumberBLD18-03942
StatusFinaled
Name GREEN TEAM CONSTRUCTION LLC
Site Address 950 N COLE RD
Project NameERA West Wind Fire Repair
Customer Number 
ePlanReviewNo
Description
(ERA WEST WIND BUILDING REPAIR) Fire Repair permit with plumbing and electrical work. A PRE-CONSTRUCTION CONFERENCE WITH THE BUILDING INSPECTOR IS REQUIRED PRIOR TO ANY RECONSTRUCTION. Permit for repairs as a result of fire damage to an existing 780 sq ft office tenant space. Work to include replacing: interior wall/ceiling finishes, cavity insulation, plumbing fixtures, electrical wiring, and interior lighting fixtures. This building is not fire sprinklered. This is a scope of work permit only with a certificate of completion to be issued upon completion and approval of the project. No existing C of O has been issued for this tenant. Tenant to submit separate tenant improvement application for work completed without a permit. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/26/20193/27/20193/27/2019PPASS
DetailsMike Jordan
Will Phone #: ###-####
DOC - Permit Finaled3/27/20193/27/20193/27/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection3/26/20193/27/20193/27/2019APASS
DetailsTroy Cobbley
life safety passed

Will Phone #: ###-####
BLD-Final3/21/20193/22/20193/22/2019PNR
DetailsMike Jordan
Will-please do as early PM as possible Phone #: ###-####. Fire/life/safety has failed.
FIRE-Final Inspection3/22/20193/22/20193/22/2019PFAIL
DetailsTroy Cobbley
Provide fire extinguisher as discussed. If exit signs are to remain then code compliant single action hardware wil be needed for both exit paths. If exit signs are removed then locks are ok for separation of tenant space. All interior hardware to be single action type as discussed. Keyed hardware at the main exit is ok with sticker. Lever hardware at main exit to be single action lever type.
FIRE-Supply Line Hydro3/21/20193/22/20193/22/2019ACANC
DetailsTroy Cobbley
Wrong inspection type scheduled. Will Phone #: ###-####
BLD-Energy code compliance12/27/201812/28/201812/28/2018APASS
DetailsTony Young
Will Phone #: ###-####
BLD-Framing/Rough-in12/19/201812/19/201812/19/2018PPART
DetailsMike Jordan
Call for access // Will Phone #: ###-####. Ok to rock ceiling and insulate. Needs to foam all missed penetrations in top plates and provide tempered glazing in new window next to main door.
BLD-Conference11/2/201811/7/201811/7/2018ADONE
DetailsMike Jordan
Call 15 mins ahead- Will Phone #: ###-####