Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-03965
StatusFinaled
Name BOISE EXECUTIVE CONSTRUCTION LLC
Site Address 439 S CAPITOL BLVD
Project NameArt Gallery Tenant Space
Customer Number 
ePlanReviewYes
Description
(ART GALLERY) Permit to create a new art gallery and associated frame shop within an existing 1,944 sq ft tenant space. Scope of work to include, removal of nonbearing interior partition walls, new nonbearing interior partition walls, new sliding door, new exterior storefront per CZC18-00268, new lighting, electrical, and mechanical work. Interior finishes shall meet the requirements of chapter 8 of the 2015 IBC. This building is part of a high rise see R1150410010 for additional projects on this structure that has been divided into condo's. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/28/20191/29/20191/29/2019APASS
DetailsDave Hannah
Call 30 min before for access. Phone #: ###-#### Inspection requested via web by Tyson Jardine
FIRE-Final Inspection1/29/20191/29/20191/29/2019APASS
DetailsJim Page
Previously oted items have been corrected, final life fire safety inspection for area of work.
BLD-Final12/27/201812/28/201812/28/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tyson Jardine ok for temp occ
FIRE-Final Inspection12/27/201812/28/201812/28/2018APART
DetailsJim Page
Previously noted items have been completed except the fire alarm issue. 30 day TCO authorized by Ron Johnson for life fire safety contingent on fire alarm modification be completed.

Phone #: ###-#### Inspection requested via web by Tyson Jardine
BLD-Final12/23/201812/26/201812/26/2018PCANC
DetailsDave Hannah
Call 30 min before for access. Phone #: ###-#### >> Inspection requested via web by Tyson Jardine Inspection cancelled from web by: Tyson Jardine
FIRE-Final Inspection12/23/201812/26/201812/26/2018AFAIL
DetailsJim Page
Provide emergency lighting for the exit discharge as shown on city approved drawings. Add emergency lighting in areas shown on the city approved drawings. Fire alarm modifications are required due to new wall layout. Upright heads in south open office are painted, heads will need to be changed. Fire extinguishers need to be lowered to be code compliant.

Call 30 min before for access. Phone #: ###-#### Inspection requested via web by Tyson Jardine
BLD-Final12/21/201812/24/201812/23/2018PCANC
DetailsDave Hannah
Tyson Phone #: ###-####-please call 45 minutes prior to meet for access Inspection cancelled from web by: Tyson Jardine
FIRE-Final Inspection12/21/201812/24/201812/23/2018ACANC
DetailsJim Page
Tyson Phone #: ###-####-please call 45 minutes prior to meet for access Inspection cancelled from web by: Tyson Jardine
BLD-Framing/Rough-in11/29/201811/30/201811/30/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tyson Jardine
BLD-Framing/Rough-in11/27/201811/28/201811/28/2018AFAIL
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tyson Jardine used wood studs must use steel studs