Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-04118
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC33207 Micron B24D and B24E
Customer Number 
ePlanReviewYes
Description
(MICRON B24D and B24E) (C33207) Permit to infill an existing opening that currently has a roll up fire door in the 4-hr rated Fire Wall between buildings 24D and 24E with a 2-hour fire resistance rated Fire Barrier to enclose a Rorze Sorter. Work to include: removal of the existing roll up fire door and the construction of the 2-hour rated enclosure in Fabrication Link 158B for the relocation of the Rorze Sorter and install additional fire sprinkler heads. Refer to the Code Alternate approved by the building official and fire marshal for additional information.This building is fire sprinklered for area increase with an approved fire alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/22/201910/22/201910/22/2019APASS
DetailsJim Storey
call ahead 1/2 hour and meet in B26 lobby. thanks Phone #: ###-#### Inspection requested via web by Daniel Cook
DOC - Permit Finaled10/22/201910/22/201910/22/2019PPASS
DetailsJim Storey
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed.

DAN- CALL 30 PRIOR MEET@ BUILD 26 LOBBY Phone #: ###-####
BLD-Framing/Rough-in6/21/20196/24/20196/24/2019PPASS
DetailsJim Storey
Drywall laps and screw schedules to verify compliance with w/UL Data Sheets Phone #: ###-#### Inspection requested via web by Paul Marcolina framing ok gyp listings being followed with stager and screw sch.// ok to finsh.