Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD18-04210
StatusIssued
Name GUHO CORP
Site Address 855 W BROAD ST
Project NameHawkins Co. - Fire Repair
Customer Number 
ePlanReviewYes
Description
(HAWKINS COMPANIES REPAIR) Minimal work to replace walls and chases due to fire / smoke damage at (The Knitting Factory) tenant below. A repair permit for the floor/ceiling has been issued under BLD18-03753. A PRE-CONSTRUCTION CONFERENCE WITH THE BUILDING INSPECTOR IS REQUIRED PRIOR TO ANY RECONSTRUCTION. Work to include replacing: interior wall finishes, mechanical chase, cavity insulation, electrical wiring, and minor plumbing repair. This permit is not intended to establish a Certificate of Occupancy for any tenant. The existing Certificate of Occupancy is still valid. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20197/17/20197/17/2019APASS
DetailsDave Hannah
Tom Phone #: ###-####
FIRE-Final Inspection7/17/20197/17/20197/17/2019PPASS
DetailsJim Page
FIre sprinkler inspection has been completed (Fire sprinkler modifications was completed under permit for Knitting Factory), no fire alarm modifications in area of work, fire exitnguishers are placed in common areas with current ispection tags. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
BLD-Final4/17/20194/17/20194/17/2019PFAIL
DetailsJim Storey
Tom Phone #: ###-#### need fire final
BLD-Framing/Rough-in2/26/20192/27/20192/27/2019APASS
DetailsBrandon Shaw
Seal penetrations in ceiling, at mech. room...
BLD-Framing/Rough-in2/26/20192/26/20192/26/2019PCANC
DetailsJim Storey
Tom Phone #: ###-#### mec inspector and arch. plan states shaft
BLD-Framing/Rough-in1/31/20192/1/20192/1/2019APART
DetailsBrandon Shaw
Framing around mech duct work, second floor...
BLD-Conference12/20/201812/20/201812/20/2018PDONE
DetailsDave Hannah
Tom Phone #: ###-####