BLD-Final | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Dave Hannah
|
|
|
Gemma Phone #: ###-####
|
DOC - Permit Finaled | | | 3/10/2020 | | DONE |
|
|
|
finaled per David Hannah
|
FIRE-Final Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | PASS |
Jim Page
|
|
|
Fire alarm issue has been resolved, final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Tom Phone #: ###-####
|
BLD-Final | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok for to final after fire oks this permit is not for occ
|
FIRE-Final Inspection | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection has been completed, fire alarm inspection is aprtially complete (TCO is authorized for fire alarm, see notes under fire alarm permit FIR19-00273), fire extinguisher is placed with a current inspection tag. Partial final inspection for life fire safety complete, final sign off is contingent on fire alarm issue being resolved, 90 day TCO authorized per conversation with Ron Johnson with Boise Fire. As stated in the description, no occupancy is allowed under this permit.
Requesting 7AM - Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|