BLD-Final | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Mike Jordan
|
|
|
Shawn Phone #: ###-####
|
DOC - Permit Finaled | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-####. Provide blower door test results and post. Install seal on 20min. door and set hinges for self closing.
|
BLD-Energy code compliance | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Mike Jordan
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. All corrections have been made. Ok to insulate.
|
BLD-Framing/Rough-in | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | FAIL |
Tell Riley
|
|
|
Shawn Phone #: ###-####//correction notice issued for headers, windows added in shear wall//see pg S9 for details of hardware required at truss wall conections and shearwall connections//
|
BLD-Framing/Rough-in | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | NR |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Needs to provide a full set of city approved plans. Missing Structural pages, which contained engineering for theRV bay tall walls and shear walls.
|
BLD-Foundation | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PART |
Mike Jordan
|
|
|
wall // Sean Phone #: ###-####
|
BLD-Foundation | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | CANC |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|
BLD-Footing | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
|