BLD-Final | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Tell Riley
|
|
|
Jason Phone #: ###-####//final complete per plans//no fixed seating in the break room//
|
FIRE-Final Inspection | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection has been completed, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Tell Riley
|
|
|
Jason Phone #: ###-####//two offices//no changes//
|
BLD-Ceiling Grid Inspection | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PART |
Tell Riley
|
|
|
John Phone #: ###-####//ceiling grids ok to cover in new cubicle area//Hvac and electrical verified//signed area noted on plans//
|
BLD-Framing/Rough-in | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PART |
Tell Riley
|
|
|
John Phone #: ###-####//3 office areas ok to cover framing//electrical and HVAC verified//
|
BLD-Final | 6/10/2019 | 6/11/2019 | 6/11/2019 | P | PART |
Tell Riley
|
|
|
Jason Phone #: ###-####// part ok//noted on plans//same area as fire life safety part//
|
FIRE-Final Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the area inspected where life safety is passed.. It has been dated and signed by me.
Jason Phone #: 208-
###-####
|
FIRE-Final Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | FAIL |
Troy Cobbley
|
|
|
Jason and I went over life safety requirements to allow occupancy in part of the scope of work. Jason Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|