Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD19-00283
StatusIssued
Name RCH CONSTRUCTION
Site Address 1517 N CLAREMONT DR
Project Name1517 Claremont Drive Remodel
Customer Number 
ePlanReviewYes
Description
SPECIAL INSPECTIONS FOR WELDS AND CABLE RAIL - WUI - HILLSIDE - Permit for a major remodel and 886sq' addition. A basement storage area converts to a Laundry Room, an Office is converted to a Master Bath, the Garage is enlarged to 994sq', a Rec Room and Full Bath is added, decks and covered patios are constructed. At the end of this project the home is 4bd/4bth. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** SPRINKLERS ARE NOT REQUIRED. LGM

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover5/6/20205/7/20205/7/2020APASS
DetailsJim Storey
Basement wall covering inspection. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Framing/Rough-in5/7/20205/7/20205/7/2020APASS
DetailsJim Storey
Basement wall covering inspection. Phone #: ###-#### Inspection requested via web by Noah Richter back deck ok to cover
BLD-Footing4/20/20204/20/20204/20/2020APASS
DetailsBrandon Shaw
Deck footings inspection. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Framing/Rough-in4/17/20204/17/20204/17/2020PPASS
DetailsBrandon Shaw
Basement
OK to insulate...
BLD-Wall Bracing3/16/20203/17/20203/17/2020APASS
DetailsDave Hannah
Sheer wall inspection on daylight basement exterior wall. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Footing1/17/20201/21/20201/21/2020APASS
DetailsBrandon Shaw
Request footing inspection before 8:30 a.m. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Energy code compliance12/12/201912/13/201912/13/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Framing/Rough-in12/5/201912/6/201912/6/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Conference11/19/201911/20/201911/20/2019ADONE
DetailsBrandon Shaw
Insulation/ conditioned space conference Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Conference10/31/201911/1/201911/1/2019ADONE
DetailsBrandon Shaw
Framing conference Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Other10/23/201910/24/201910/24/2019APASS
DetailsBrandon Shaw
Masonry fireplace Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Wall cover9/27/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
Partial sheer inspection for garage Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Wall cover9/13/20199/16/20199/16/2019APASS
DetailsBrandon Shaw
Partial sheer inspection on pool house walls Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Foundation8/28/20198/29/20198/29/2019ADONE
DetailsTony Young
Noah; Phone #: ###-####
BLD-Footing8/23/20198/26/20198/26/2019APASS
DetailsBrandon Shaw
Garage and pool house footings. Please inspect late AM. Concrete is scheduled for 1 PM. Prefer inspection around 11:30-12:00. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Foundation8/15/20198/15/20198/15/2019APASS
DetailsBrandon Shaw
Retaining wall inspection.
Work in progress...
BLD-Footing8/13/20198/13/20198/13/2019PPASS
DetailsBrandon Shaw
Retaining wall and Sono tube in backyard. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Energy code compliance8/12/20198/12/20198/12/2019PPART
DetailsBrandon Shaw
Partial inspection of closed cell insulation on main living roof section.
BLD-Wall Bracing8/2/20198/5/20198/5/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Noah Richter/// partial,, front entry area,, rear gable wall,, noted on plans
BLD-Foundation7/24/20197/24/20197/24/2019PPASS
DetailsJim Storey
Inspection requested via web by Noah Richter back retaining wall rebar ok
BLD-Footing7/19/20197/22/20197/22/2019PPASS
DetailsBrandon Shaw
Will be ready by noon Inspection requested via web by Noah Richter
BLD-Footing7/1/20197/2/20197/2/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Footing6/14/20196/18/20196/18/2019ACANC
DetailsTony Young
>> Inspection requested via web by Noah Richter cancel per noah
BLD-Concrete6/10/20196/11/20196/11/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Noah Richter,, front porch walls,, rear retaining walls ok,, north brace walls ok also
BLD-Wall Bracing6/7/20196/10/20196/10/2019APART
DetailsDave Hannah
Partial sheer inspection for partial to cover. Phone #: ###-#### Inspection requested via web by Noah Richter ext house west side ext nailing ok
BLD-Footing6/6/20196/7/20196/7/2019APASS
DetailsTony Young
This is for two piers out front and they will be ready by 11:00. We have concrete called for 12:00. Phone #: ###-#### Inspection requested via web by Noah Richter
BLD-Footing6/5/20196/6/20196/6/2019APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Noah Richter,, pool reatianing wall footers on SW corner of lot.
BLD-Footing6/4/20196/4/20196/4/2019PPART
DetailsTony Young
Rebar will be in place by 12:00 and we have concrete showing up at 1:00 today. Give me a call if you have any questions. Thank you again and we look forward to seeing you soon.
Noah Richter Phone #: ###-#### Inspection requested via web by Noah Richter,, front entry wall footings,, front retaining wall footings