Permit Information
Permit NumberBLD19-00290
StatusFinaled
Name MATRIX CONSTRUCTION INC
Site Address 4776 N FIVE MILE RD Unit: 103
Project NameDr Minert DBA Boise Dentistry
Customer Number 
ePlanReviewYes
Description
(DR. MINERT DBA BOISE DENTISTRY CO)– BLDG B – SUITE #103) //PLAN MODIFICATION TO REMOVE INTERIOR MED GAS ROOM DOOR AND INFILL, REMOVE STOREFRONT WINDOW AT MED GAS ROOM, ADD AN EXTERIOR DOOR, EXTERIOR WALL INFILL AND EXTERIOR CONCRETE SLAB LANDING. 8-20-2019 JG// Permit is to remodel an existing 1832 sq. ft. business tenant space. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of interior nonbearing walls, removal of doors/door frames and relocate, removal of exterior storefront for new exterior door existing window opening, removal of millwork, removal of suspended acoustic ceiling, construction of interior non-bearing walls to create an office, some work areas, an imaging area, a 1-Hour rated medical gas room, a break room, (4) treatment rooms, a lab room, some hallways, a reception area and a waiting area, select new interior door/door frames, millwork, select new gypsum and acoustic suspended ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/20/20198/21/20198/21/2019PPASS
DetailsTell Riley
Brian Phone #: ###-####//ok per plans//pending mechanical passing later this afternoon//
FIRE-Final Inspection8/20/20198/21/20198/21/2019PPASS
DetailsTroy Cobbley
Life safety passed

Brian Phone #: ###-####
FIRE-Final Inspection8/19/20198/20/20198/20/2019PFAIL
DetailsTroy Cobbley
Need the NFPA signage as discussed and the building plan mods provided.

Brian Phone #: ###-####
BLD-Final8/19/20198/20/20198/20/2019ANR
DetailsTell Riley
Brian Phone #: ###-####//need mechanical final//fire final scheduled for afternoon//complete fire final inspection and mechanical final//call for re-inspection//
BLD-Final8/15/20198/16/20198/16/2019PCANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Brian Wilson Inspection cancelled from web by: Brian Wilson
FIRE-Final Inspection8/15/20198/16/20198/16/2019PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Brian Wilson Inspection cancelled from web by: Brian Wilson
FIRE-Final Inspection8/14/20198/15/20198/15/2019PFAIL
DetailsTroy Cobbley
Need a FIR permit for the new head in the gas closet. Need NFPA signage as discussed on the gas closet door. Need the gas closet manifold/piping certified. Brian Wilson ###-####
BLD-Ceiling Grid Inspection7/21/20197/22/20197/22/2019APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Brian Wilson//trades passed//ok to cover grid//
BLD-Ceiling Grid Inspection7/18/20197/19/20197/19/2019PNR
DetailsTell Riley
Bryan Phone #: ###-####//need trades inspections completed prior to grid cover//call for re-isnpection//
BLD-Framing/Rough-in6/18/20196/18/20196/18/2019PPASS
DetailsTell Riley
penetrations sealed through plates//framing ok to cover.//
BLD-Framing/Rough-in6/14/20196/17/20196/17/2019ANR
DetailsTell Riley
brian Phone #: ###-####//complete air seal of floor/ceiling/plate penetrations. cover seal holes in ceiling.//