(EDWARD JONES – RADAR BLDG - MAIN FLOOR SUITE #100) // 7-10-2019 PLAN MODIFICATION TO ADD NEW TENANT EDWARD JONES TO SUITE #100, FLOOR PLAN AND ELECTRICAL WORK MODIFICATIONS. JG// (An Interior non-structural demo permit was issued under BLD19-00600) Permit is to remodel an existing 1,502 sq. ft. business space and related exterior site work. Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of concrete sidewalk, exterior awnings, removal of exterior concrete basement and main floor entry stairs/landings/retaining wall/guards and handrails, back fill rear area at removed stairs/retaining wall, removal of select exterior walls, removal of roof assembly, removal of interior stairs and infill floor opening, removal of interior bearing and nonbearing walls, removal of exterior and interior door/door frames, removal of chimney and infill floor opening, removal of select raised floor, removal of exterior windows, removal of gypsum ceiling, removal of millwork, removal of plumbing fixtures, new exterior concrete sidewalk, construction of new exterior concrete front entry stairs/landings and a retaining walls with guards and handrails, new exterior front and rear awnings, new unenclosed vertical platform lift, select new structural roof support at new RTU’s, new roof assembly with spray-in cell foam insulation, construction of interior bearing and non-bearing walls to create an conference room, an office, (3) open office areas, a reception area, a break/work area and an accessible restroom, new interior furred at the exterior envelope walls with insulation, new exterior windows, new door/door frames, new exterior storefront entry door, new select wall infill at old exterior wall door opening, millwork, new gypsum and suspended acoustic ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: special inspection required, see 310 form. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20197/16/20197/16/2019PPASS
DetailsDave Hannah
Armando Phone #: ###-####
BLD-Final7/15/20197/16/20197/16/2019APEND
DetailsDave Hannah
Armando Phone #: ###-####
FIRE-Final Inspection7/15/20197/15/20197/15/2019PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Armando Phone #: ###-####
FIRE-Final Inspection7/9/20197/9/20197/9/2019PCANC
DetailsJim Page
As of these notes the permit status is under review for floor plan modifications, floor plan needs to match city approved drawings for life fire safety inspection, need permit to be in issued status for life fire safety inspection to be completed, this request is cancelled and a new inspection will need to be requested when permit is back in issued status.

Armodo Phone #: ###-####
BLD-Ceiling Grid Inspection7/1/20197/2/20197/2/2019APASS
DetailsDave Hannah
Armando Phone #: ###-####
BLD-Other5/30/20195/31/20195/31/2019ADEFR
DetailsDave Hannah
welding // almondo Phone #: ###-#### needs spec insp
BLD-Concrete5/22/20195/23/20195/23/2019ADONE
DetailsDave Hannah
Armando Phone #: ###-####
BLD-Energy code compliance5/8/20195/8/20195/9/2019PPASS
DetailsDave Hannah
after 2 // Armando Phone #: ###-####
BLD-Framing/Rough-in4/11/20194/12/20194/12/2019APASS
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Conference3/22/20193/25/20193/25/2019ADONE
DetailsDave Hannah
Ken Phone #: ###-####