BLD-Final | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Korey Hall
|
BLD-Final | 10/25/2019 | 10/28/2019 | 10/28/2019 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Korey Hall
|
FIRE-Final Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provide for associated trades on signature card.
Phone #: ###-#### Inspection requested via web by Korey Hall
|
BLD-Final | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | NR |
Jim Storey
|
|
|
CORY Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | FAIL |
Jim Page
|
|
|
Fire alarm defecincies need to be corrected and fire alarm inspection needs to be completed and finaled before life fire safety inspection can be completed.
CORY Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Korey Hall
|
BLD-Framing/Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
Dave Hannah
|
|
|
Framing inspection for walls and lid in bathrooms only. Phone #: ###-#### Inspection requested via web by Korey Hall
|
BLD-Framing/Rough-in | 8/28/2019 | 8/28/2019 | 8/29/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Korey Hall ok to rock top 4 ft of walls
|