BLD-Final | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Mike Jordan
|
|
|
Sorry for the re inspections. Kris has appropriate signage and it will be up by noon. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved. Ok for perm occ.
|
BLD-Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Mike Jordan
|
|
|
Re inspection for full c.o. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved except for the ADA bathroom signage. Provided signage is not ADA compliant.
|
BLD-Final | 8/11/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Mike Jordan
|
|
|
Kris will be the onsite contact for this. His number is above. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Post building address. Install ADA bathroom signs. Provide ADa compliant mirrors in bathrooms. Correction notice issued. Ok for temp. occ.
|
FIRE-Final Inspection | 8/11/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, addressing will be installed before BLD final. Final life fire safety inspection for area of work complete.
Kris will be the contact for this inspection. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
FIRE-Final Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the south exit door as per plans and provide testing of the exit lights/emergency lights/exit discharge lights.
Kris will be the on site contact for this. Please call him prior to your coming so he can be sure to be there. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Energy code compliance | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mike Jordan
|
|
|
Insulation will be completed by about 3. Hopefully this will work in your schedule. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Framing/Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Mike Jordan
|
|
|
Inspection of framing for new interior walls Phone #: ###-#### Inspection requested via web by Ryan Allen. Ok to insulate.
|
BLD-Framing/Rough-in | 7/8/2019 | 7/8/2019 | 7/8/2019 | A | CANC |
Mike Jordan
|
|
|
Inspection of new framing in T.I. project. Thanks Phone #: ###-#### >> Inspection requested via web by Ryan Allen Inspection cancelled from web by: Ryan Allen
|
BLD-Conference | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | DONE |
Mike Jordan
|
|
|
We would like ok to hang double 5/8 sheetrock to area of fire wall where we will later frame perpendicular walls onto. No plumbing or electrical or HVAC is embedded within this portion of wall. Please call Kris, the contact for this ###-####. He can meet you if needed. Key box code on door is 1127. Thank you Phone #: ###-#### Inspection requested via web by Ryan Allen
|