BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Tony Young
|
|
|
screened // Clint Phone #: ###-####
|
DOC - Permit Finaled | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Aging Inspection | 5/27/2020 | 5/27/2020 | 6/3/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/26/2020 | 5/26/2020 | 5/27/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Tony Young
|
|
|
Luke Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | DEFR |
Tony Young
|
|
|
Luke Phone #: ###-####, defr to pm
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | NR |
Tony Young
|
|
|
Luke Phone #: ###-####
|
BLD-Conference | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PART |
Tony Young
|
|
|
Luke Phone #: ###-####,, frame ?s
|
BLD-Framing/Rough-in | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | NR |
Tony Young
|
|
|
Luke Phone #: ###-####,,mostly done but still corrections needed,, will set up a conference
|
BLD-Framing/Rough-in | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | FAIL |
Tony Young
|
|
|
Luke Phone #: ###-####// frame walk through only,, will need truss fixes also on missing plate,, possible backwards foor trusses
|
BLD-Framing/Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PART |
Tony Young
|
|
|
jeremy Phone #: ###-####,, frame not ready,, soffits are work in progress,, ok
|
BLD-Other | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | NR |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####// soffit. No soffit material on site or being installed.
|
BLD-Wall cover | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####// soffit material not on site yet
|
BLD-Conference | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PEND |
Tony Young
|
|
|
Luke Phone #: ###-####,, cut back garage doors,, need to verify with engineer on hold downs and shear
|
BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | NR |
Tell Riley
|
|
|
call half hour before // John Phone #: ###-####//wanted to do walk through prior to trades rough ins//discussed some issues an noted areas to double check prior to framing inspection//framing inspection will need to be completed after rough ins are inspected and passed//still need engineering fix for garage door areas where hold downs were removed//
|
BLD-Framing/Rough-in | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | DEFR |
Jim Storey
|
|
|
call half hour before // John Phone #: ###-####//out of time
|
BLD-Wall Bracing | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Tell Riley
|
|
|
shear // John Phone #: ###-####//shear nailing exterior ok//will need engineer to provide fix for missed hold downs at garage and front wall//interior shear walls were not complete at inspection//ok to wrap house when 2nd level straps and nails added as discussed//
|
BLD-Other | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Tony Young
|
|
|
under floor - Nathan Phone #: ###-####
|
BLD-Foundation | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Tony Young
|
|
|
Nick Phone #: ###-####
|