BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|
DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | FAIL |
Tell Riley
|
|
|
call for access code Shawn Phone #: ###-#### or ###-#### Marty//plans show r 38 insulation--description is prescriptive of R 49--manual J also shows R49 attic insulation//insulation certificate does not list crawlspace insulation//remove dust covers from smoke and smoke/CO detectors// CN posted onsite//
|
BLD-Blower Door Test Results | 2/7/2020 | 2/7/2020 | 2/7/2020 | A | DONE |
Tell Riley
|
|
|
3.78 ACH 50
|
BLD-Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | CANC |
Tell Riley
|
|
|
Shawn call to cancel, not ready will call to reschedule//Shawn Phone #: ###-####
|
BLD-Aging Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | | PASS |
Tell Riley
|
|
|
WIP
|
BLD-Aging Inspection | 1/1/2020 | 1/1/2020 | 1/2/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tell Riley
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tell Riley
|
|
|
Shawn Phone #: ###-####//correction made//
|
BLD-Framing/Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Tell Riley
|
|
|
Shawn Phone #: ###-####//need to add header in door opening--interior bearing wall next to front door//ok to insulate only//
|
BLD-Wall Bracing | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Tell Riley
|
|
|
shear // Shawn Phone #: ###-####//corrections made//
|
BLD-Wall Bracing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Tell Riley
|
|
|
shear // Shawn Phone #: ###-####//need portal frame clarifiaction//all other shear ok//
|
BLD-Wall Bracing | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | FAIL |
Tell Riley
|
|
|
shear // shawn Phone #: ###-####//correction notice posted//finish portal frame// verify portal frame over windows//add blocking per plans//
|
BLD-Foundation | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PART |
Jim Sly
|
|
|
Shawn Phone #: ###-#### see footing notes.....Rebar etc. in footing and wall....OK.
|
BLD-Footing | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Jim Sly
|
|
|
Nate Phone #: ###-#### Appears OK........but no lines pulled. Really close. pour at own risk.
|