Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD19-01465
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre Phase 9 & 10
Customer Number 
ePlanReviewYes
Description
(BOISE CENTRE - PHASE 9 & 10) The fire sprinkler system is used for fire area. This is a scope of work permit and a certificate of completion will be issued once work is complete. Work to include, new wall finishes in several hallways, installation/replacement of existing doors, installation of new door hardware, and replace storefronts and finishes at (7) entries. Work done at the main entry on the Grove Plaza will consist of storefront replacement, minor structural work to add a vestibule, replacement of outer mullion caps along the curved portion of the existing curtain wall, changing color from dark bronze to sterling gray to match Boise Centre Concourse. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits are required prior to beginning any modification or installation work on such systems. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  1/28/2020 DONE
BLD-Final1/17/20201/17/20201/17/2020APASS
DetailsDave Hannah
Boise Centre Main vestibule final. Phone #: ###-#### Inspection requested via web by Jake Wilson
FIRE-Final Inspection1/15/20201/16/20201/16/2020PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not provided at time of inspection.

Fire life safety inspection on boise center front vestibule. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Final1/9/20201/9/20201/13/2020PCANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Final12/19/201912/19/201912/19/2019PNR
DetailsDave Hannah
Final inspection for Main entry vestibule off the plaza. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Framing/Rough-in9/20/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
Check of fire treated plywood, Framing. Phone #: ###-#### Inspection requested via web by Jake Wilson
BLD-Conference9/18/20199/19/20199/19/2019APASS
DetailsDave Hannah
Conference with Hannah on Framing Phone #: ###-#### Inspection requested via web by Jake Wilson framing ok