Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberBLD19-01522
StatusFinaled
Name KB FINANCIAL LLC
Site Address 2252 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberSEE BLD19-01523
ePlanReviewYes
Description
***W.U.I. Foothills Zone "A" Class "A" Roof Required and Non-Combustible Construction*** (ISSUE WITH BLD19-01523) Permit for the construction of a new 1904 sq. ft., two story (first story 786 sq. ft., second story 1118 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 62 sq. ft. of covered patio/porch and a 492 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201911/1/201911/1/2019PPASS
DetailsTony Young
Ron Phone #: ###-####
DOC - Permit Finaled11/1/201911/1/201911/1/2019PPASS
DetailsTony Young
BLD-Final10/31/201911/1/201911/1/2019APART
DetailsTony Young
Ron Phone #: ###-####.. work in progress on handrail and safety film on glass
BLD-Final10/30/201910/31/201910/31/2019PNR
DetailsTony Young
Ron Phone #: ###-####,, needs rails, tempered glass, etc
BLD-Energy code compliance9/3/20199/3/20199/3/2019PPASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Energy code compliance8/30/20198/30/20198/30/2019PPEND
DetailsTony Young
Ron Phone #: ###-####,, ok to cover pending adding SDS screws in the ledger and bracing the south gable per plan
BLD-Energy code compliance8/28/20198/29/20198/29/2019PNR
DetailsTony Young
Ron Phone #: ###-####,, frame corrections not done
BLD-Framing/Rough-in8/26/20198/26/20198/26/2019PPART
DetailsTony Young
Ron Phone #: ###-####,, ok to insulate,, brace gables and overlap truss braces,, also seal property line wall in attic area
BLD-Wall cover8/21/20198/22/20198/22/2019AFAIL
DetailsTony Young
Ron Phone #: ###-####,, c/notice posted,, needs plans/ truss engineering,, point loads, toe nails, seal top of common firewall,, seal all holes
BLD-Wall Bracing7/24/20197/24/20197/24/2019PPASS
DetailsDave Hannah
Ron Phone #: ###-####
BLD-Framing/Rough-in7/22/20197/22/20197/22/2019PFAIL
DetailsBrandon Shaw
Hold downs to be nailed as per Manfac. install instruc...
Interior shear panels to be as per plans...
BLD-Other7/8/20197/9/20197/9/2019PPART
DetailsTony Young
Aaarin- for attic fire wall Phone #: ###-####,, porch area ok
BLD-Other7/1/20197/2/20197/2/2019APART
DetailsTony Young
fire wall insp// Aaron Phone #: ###-####,, main area 2nd floor ok
BLD-Wall Bracing6/19/20196/20/20196/20/2019APART
DetailsTony Young
party wall // Aaron Phone #: ###-####,, 1st layer of firewall,, work in progress,, ok
BLD-Footing6/13/20196/13/20196/13/2019PPART
DetailsTony Young
rebar-Austin Phone #: ###-####,, front footings,, interior walls ok
BLD-Foundation6/10/20196/11/20196/11/2019APART
DetailsTony Young
rebar // Austin Phone #: ###-####,, interior footings ok
BLD-Footing6/4/20196/5/20196/5/2019APART
DetailsTony Young
rebar Phone #: ###-####,, walls ok on same footings
BLD-Footing6/4/20196/4/20196/4/2019PNR
DetailsTony Young
rebar Phone #: ###-####
BLD-Foundation5/31/20196/3/20196/3/2019APART
DetailsTony Young
Austin Phone #: ###-####,, rear and outside footings ok,,