BLD-Wall cover | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | DEFR |
Jim Storey
|
|
|
please come inspect the daft stop on the roof for the parapet. Roof line. Phone #: ###-#### Inspection requested via web by Andy Pense
bld19-02339
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Dave Hannah
|
|
|
Framing inspection on the SE corner soffit on the first floor. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 5/4/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Brandon Shaw
|
|
|
North East corner framing inspection to cover. 6th floor to 8th. Also the soffit on the first floor North elevation. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PART |
Dave Hannah
|
|
|
please get with Jake ISI when on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/30/2020 | A | PASS |
Dave Hannah
|
|
|
Please come inspect the North East exterior framing from GL, 8-11 levels 6-10. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/30/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection on the Framing to cover. West elevations to the roof. South West corner to the roof. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/23/2020 | 4/23/2020 | 4/30/2020 | A | PASS |
Dave Hannah
|
|
|
Inspection on the Framing to cover. West elevations to the roof. South West corner to the roof. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/16/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Dave Hannah
|
|
|
First floor North Exterior soffit. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PASS |
Dave Hannah
|
|
|
Inspection for exterior soffit North-West elevation floors 6, 7, 8. Call Mike when your on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/6/2020 | 4/6/2020 | 4/8/2020 | P | PART |
Dave Hannah
|
|
|
Framing inspection for the 2nd 3rd 4th floor interior. south side soffit first floor south side ; first floor east side. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Dave Hannah
|
|
|
Framing inspections on the first floor South and West elevations for the ribbon framing to get sheeted. Phone #: ###-#### Inspection requested via web by Andy Pense sw corner of 2,3 &4 ok
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PART |
Dave Hannah
|
|
|
Please inspected the West side of the building framing. Call Andy when on site. Phone #: ###-#### Inspection requested via web by Andy Pense nw corner levels 2,3and 4 ok
|
BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PART |
Dave Hannah
|
|
|
Framing inspection please get with Andy Pense/ Mike Koci Phone #: ###-#### Inspection requested via web by Andy Pense first floor ok to start one siding top of walls
|
BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Dave Hannah
|
|
|
Framing inspection on the north elevations. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Dave Hannah
|
|
|
PM inspection for the East end framing. Please get with Mike Koci or Andy Pense. Phone #: ###-#### Inspection requested via web by Andy Pense ok to cover
|
BLD-Framing/Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PART |
Dave Hannah
|
|
|
Please come visit to view the framing on the South East elevation. Phone #: ###-#### Inspection requested via web by Andy Pense FLOORS 2,3 & 4 EAST end south wall ok to cover
|
BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | CANC |
Dave Hannah
|
|
|
Framing clip inspection. Please get with Mike Koci and or Andy Pense Phone #: ###-#### >> Inspection requested via web by Andy Pense Inspection cancelled from web by: Andy Pense
|
BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Dave Hannah
|
|
|
Please come out and inspect the screw and attachment of clips prior to sheeting. Please see Mike Koci or Andy Pense for comments. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 2/19/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Dave Hannah
|
|
|
please stop by and check out installation of the clips on 3rd-5th. Get with Mike Koci while on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall Bracing | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Dave Hannah
|
|
|
Can we get an inspector to check out our clips attached to the bent plate levels 2 and 3. Please reach out to Mike Koci or Andy Pense Superintendents on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Other | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PEND |
Dave Hannah
|
|
|
Need to have the framing clips to the steel inspected please. Phone #: ###-#### Inspection requested via web by Andy Pense work in progresss
|
BLD-Other | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | DONE |
Dave Hannah
|
|
|
Need to have the Fire proofing inspected on the 2nd floor. Please get a hold of Mr. Mike Koci or my self when on site. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 1/17/2020 | 1/21/2020 | 1/23/2020 | A | PASS |
Dave Hannah
|
|
|
SOG Bar inspection pre pour. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 12/16/2019 | 12/19/2019 | 12/19/2019 | A | PEND |
Dave Hannah
|
|
|
concrete placement 2nd level east. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PEND |
Dave Hannah
|
|
|
please come out and do a pre pour inspection. Phone #: ###-#### Inspection requested via web by Andy Pense east half second fl ok after spec inspection sign off
|
BLD-Footing | 10/21/2019 | 10/25/2019 | 10/25/2019 | A | PEND |
Mike Jordan
|
|
|
GL-A continuous footings need to be inspected. Phone #: ###-#### Inspection requested via web by Andy Pense. Ok pending special inspection.
|
BLD-Foundation | 10/21/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
GL-1 walls need to be inspected. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Jim Storey
|
|
|
GL-A spread footings. Please see on site superintendent to confirm. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Foundation | 10/14/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Jim Storey
|
|
|
Continuous Perimeter footings. Phone #: ###-#### Inspection requested via web by Andy Pense 1 grid line wall ok parallel to idaho road/ no one in office no log seen.
|
BLD-Foundation | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | PEND |
Dave Hannah
|
|
|
Please call Andy Pense ###-#### if there are and comments or concerns.
Shear Walls and Piers. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec inpc sign offs
|
BLD-Footing | 10/8/2019 | 10/8/2019 | 10/9/2019 | P | PASS |
Dave Hannah
|
|
|
Please call Andy Pense ###-#### if there are and comments or concerns.
Continuous Footings. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec inpc sign offs
|
BLD-Footing | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PEND |
Dave Hannah
|
|
|
Please get with Andy Pense with any concerns or comments thank you. We need to have a footing inspection on the material man hoist footing as well as the elevator footing.
Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec insp final sign off is oked
|
BLD-Footing | 9/30/2019 | 10/2/2019 | 10/3/2019 | A | PASS |
Dave Hannah
|
|
|
Brace frame footing inspection at Grid 5.2. Large mat footing in middle of project. Please call Mike when in route. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci ok to place concrete after spec inspection sign offs
|
BLD-Footing | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Dave Hannah
|
|
|
Footing inspection at Gridline 1 and 3 along gridline H. The southeast section of the building. Please call Mike when in route. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci
|
BLD-Footing | 9/27/2019 | 9/30/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Inspection for Tower crane mat footing - please call Mike when headed to the site. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci
|
BLD-Footing | 9/20/2019 | 9/25/2019 | 9/25/2019 | A | PEND |
Dave Hannah
|
|
|
For the core footing Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 9/19/2019 | 9/23/2019 | 9/24/2019 | A | PART |
Dave Hannah
|
|
|
Inspection of crane footing. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 9/20/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Dave Hannah
|
|
|
spread footings on grids 9, 10 ; 11, from A to H Phone #: ###-#### Inspection requested via web by Andy Pense
|