BLD-Final | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
DOC - Permit Finaled | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/10/2020 | 6/10/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Final | 6/5/2020 | 6/8/2020 | 6/10/2020 | A | PEND |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Final | 6/9/2020 | 6/9/2020 | 6/10/2020 | P | PEND |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Blower Door Test Results | 6/9/2020 | 6/9/2020 | 6/10/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// 2.3
|
BLD-Final | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PART |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// ok pending engineer letter,, drainage
|
BLD-Final | 4/3/2020 | 4/6/2020 | 4/6/2020 | P | NR |
Tony Young
|
|
|
Building Final Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// needs address, fire caulking, drainage away from foundation and vents, seal front door, cable railing engineering, water in crawl space , crawl handle
|
BLD-Energy code compliance | 10/28/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Tony Young
|
|
|
Insulation Inspection. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Tell Riley
|
|
|
Soffit and Sheetrock Phone #: ###-#### Inspection requested via web by Clayton Conner//soofits ok per detail on plans//will fire caulk can lights//WIP as they work around the house//ok to continue//
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/24/2019 | A | CANC |
Tony Young
|
|
|
Soffit and Facia Inspection. Thank you! Phone #: ###-#### >> Inspection requested via web by Clayton Conner Inspection cancelled from web by: Clayton Conner
|
BLD-Framing/Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Wall Bracing | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Tony Young
|
|
|
Shear Wall Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Clayton Conner// exterior ok to cover after minor fixes
|
BLD-Foundation | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Tell Riley
|
|
|
pouring around 12--Edgar Phone #: ###-####//need to install hold downs at locations shown on plans//
|
BLD-Footing | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Dave Hannah
|
|
|
pouring at noon - ready at 9 or 10 // Edgar Phone #: ###-####
|