BLD-Final | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####,, guard rail made ok with plywood
|
DOC - Permit Finaled | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | FAIL |
Tell Riley
|
|
|
BRYAN Phone #: ###-####//correction notice issued for cable guard at stairs--needs engineer design and site inspection and letter//finish stucco repairs on exterior//
|
BLD-Final | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | CANC |
Tony Young
|
|
|
cancel and reschedule BRYAN Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PART |
Tony Young
|
|
|
Brian Phone #: ###-####,, see painted corrections, ok to insulate
|
BLD-Wall Bracing | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####exterior only- ok to cover//check LIB bracing on interior walls at framing//
|
BLD-Footing | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Tell Riley
|
|
|
Brian Phone #: ###-####//setbacks per approved plans//tight on 3' garage side//verify 3' at wall inspection//
|
BLD-Footing | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | CANC |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Will reschedule for this pm.
|