BLD-Final | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Jim Storey
|
|
|
Garage code is 1500 or side door should be unlocked. Please call with any questions. Thanks Phone #: ###-#### Inspection requested via web by Joseph knight
|
DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Tony Young
|
|
|
Garage code is 1500, or side door will be unlocked. Plans are on the table inside. If you have any questions feel free to call if I''m not there Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Framing/Rough-in | 1/22/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Dave Hannah
|
|
|
Garage code is 1500 if closed, plans are on the table. please call if you have any questions. Would like to insulate tomorrow. Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Wall Bracing | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Foundation | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Dave Hannah
|
|
|
wall // Annie Phone #: ###-####
|
BLD-Footing | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Tony Young
|
|
|
Annie-concrete schedule for 11am Phone #: ###-####,, work in progress,, ok to pour when ready
|