BLD-Final | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Mike Jordan
|
|
|
*screened* Call for access code - Jeff Phone #: ###-####
|
DOC - Permit Finaled | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | DONE |
Mike Jordan
|
|
|
4.6
|
BLD-Energy code compliance | 12/24/2019 | 12/26/2019 | 12/26/2019 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 12/24/2019 | 12/26/2019 | 12/26/2019 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | FAIL |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | FAIL |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Complete lateral bracing on A06 truss. (missed bracing on last A06 truss) Needs to encapsulate insulation on all six sides at perimeter of vaulted ceiling. do not cover.
|
BLD-Framing/Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | FAIL |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Complete lateral bracing on A03,A04,A05 and A06 trusses. Fireblock concealed space by shower/tub at ceiling. Provide strongbacks on both gable ends. provide 2x6 studs under top plate breaks in garage, both sides, (east and west)
|
BLD-Wall Bracing | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Mike Jordan
|
|
|
pouring at 1:45 // James Phone #: ###-####
|