Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-03734
StatusUnder Review
Name DTM GROUP OF COMPANIES LLC
Site Address 2418 S LIBERTY ST
Project NameJD/Fischer Industrial Developm
Customer NumberBLD19-04010 BUILDING #20
ePlanReviewYes
Description
***SEE DOCUMENTS FOR EMAILS, APPLICANT WILL COMPLETE SITE WORK AND BUILDING 10 UNDER THIS PERMIT. BUILDING 20 WILL BE COMPLETED AT A LATER DATE //MDH*** Permit to construct a 16,000 sqft pre-engineered metal building and associated site improvements. The building is separated by a 2-hour wall with the west side space being 5,915 sqft and the east side space being 9,650 with a second story of 1,265 sqft.. Work includes: construction of footing foundation, slab on grade concrete floor, interior non-load bearing walls, interior stairs, mechanical work, plumbing work, electrical work and site work. The intended use reviewed for is B, F1, and S1 with no occupancy occurring under this permit. This building is fire sprinkled as the future tenant has a woodworking area exceeds 2,500 sqft.. Approval is contingent on adhering to approved plans, engineering, and local codes and ordinances. Note: special inspection required see attached form #310. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/7/20208/7/20208/7/2020PCANC
DetailsMike Jordan
progress shear inspection due to hidden OSB when wall is stood. Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Wall Bracing8/7/20208/7/20208/7/2020PPASS
DetailsMike Jordan
progress shear inspection due to hidden OSB when wall is stood. Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Concrete8/5/20208/5/20208/5/2020PPASS
DetailsMike Jordan
Non-Structural building interior slab on grade ready for placement Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Energy code compliance8/5/20208/5/20208/5/2020PPASS
DetailsMike Jordan
Metal Building Simple Saver Insulation System Complete Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Framing/Rough-in7/17/20207/20/20207/20/2020APASS
DetailsMike Jordan
Pre-engineered building erected, ready for insulation covering of purlins and girts. Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Energy code compliance6/23/20206/24/20206/24/2020APASS
DetailsJim Storey
Rigid Insulation Inspection on stem walls, ready for backfill. Phone #: ###-#### Inspection requested via web by Dan Murrer
BLD-Foundation6/18/20206/19/20206/19/2020APASS
DetailsMike Jordan
north stem wall rebar inspection (other half) Phone #: ###-#### Inspection requested via web by Dan Murrer. north perimeter stemwalls.
BLD-Foundation6/17/20206/18/20206/18/2020APASS
DetailsMike Jordan
rebar inspection for 1/2 of the stem walls. Phone #: ###-#### Inspection requested via web by Dan Murrer. South and west exterior stemwalls.
BLD-Foundation6/16/20206/17/20206/17/2020PCANC
DetailsMike Jordan
Building Stem Wall Concrete. If possible, request inspection as soon as possible after lunch hour. Concrete scheduled for mid-afternoon. MTI scheduled for special inspections. Phone #: ###-#### >> Inspection requested via web by Dan Murrer Inspection cancelled from web by: Dan Murrer
BLD-Footing6/15/20206/16/20206/16/2020APART
DetailsMike Jordan
Rebar Inspection for Afternoon pour Phone #: ###-#### Inspection requested via web by Dan Murrer. Perimeter footings and column psd footings. Work in progress. Ok to place concrete pending special inspection.
BLD-Footing6/12/20206/15/20206/15/2020PCANC
DetailsMike Jordan
If possible request inspection at 3PM. MTI will be there at 3PM as well for rebar, and concrete cylinders for pour at 4PM Phone #: ###-#### >> Inspection requested via web by Dan Murrer Inspection cancelled from web by: Dan Murrer
BLD-Other5/20/20205/20/20205/20/2020PCANC
DetailsMike Jordan
Erosion and Sediment Control Program Site Preparation Inspection Phone #: ###-#### Inspection requested via web by Dan Murrer