BLD-Wall cover | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tony Young
|
|
|
Inspecting beam change(was installed upside down) and connectors at back patio. Phone #: ###-#### Inspection requested via web by Chad Aland
|
BLD-Wall Bracing | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PART |
Tony Young
|
|
|
Please call chad prior to inspection. Phone #: ###-#### Inspection requested via web by Chad Aland// garage ok after minor fixes
|
BLD-Energy code compliance | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Tony Young
|
|
|
Call Chad before arriving if possible. 208.994.2805 Phone #: ###-#### Inspection requested via web by Chad Aland// ..,, inside of house ok,, back patio not approved,, needs beam approved as built or turned over and connections
|
BLD-Energy code compliance | 4/1/2020 | 4/1/2020 | 4/1/2020 | A | PART |
Tony Young
|
|
|
was not ready yesterday...,, inside of house ok,, back patio not approved,, needs beam approved as built or turned over and connections
|
BLD-Energy code compliance | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | NR |
Tell Riley
|
|
|
Please call chad prior to inspection Plans are in the fireplace Phone #: ###-#### Inspection requested via web by Chad Aland//not ready at time of inspection//will call back in//told Chad it was ok to stock gyp board//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PART |
Dave Hannah
|
|
|
Please call Chad prior to inspection Phone #: ###-#### Inspection requested via web by Chad Aland ok to insulate but need to check beams and headers at energy
|
BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Chad Aland. Mech rough in inspection has failed.
|
BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | NR |
Dave Hannah
|
|
|
Chad Phone #: ###-#### two red tags on window one r elec and one mec and i needs a full set of truss engin eering on site
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | CANC |
Dave Hannah
|
|
|
stem wall // Willie Phone #: ###-####
|
BLD-Foundation | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PART |
Tell Riley
|
|
|
wILLIE Phone #: ###-####//Zoning cert found, setbacks per plans, added bar in footing areas//
|
BLD-Wall Bracing | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Tony Young
|
|
|
Inspection requested via web by Chad Aland
|
BLD-Foundation | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Tony Young
|
|
|
stem wall // Willy Phone #: ###-####
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Tony Young
|
|
|
stem wall // Willy Phone #: ###-####// not a frame,, foundation ok
|
BLD-Footing | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Dave Hannah
|
|
|
willie Phone #: ###-####
|