(BOISE SPINE CENTER) This building is not fire sprinkled. Permit to combine and remodel an existing 4,890 sqft. tenant space. Work to include: Demo non-bearing interior wall and two exterior doors. Construct non-bearing interior walls, doors, exterior glazing, lighting fixtures, finishes, mechanical work, and electrical work. Approval is contingent on adhering to the approved plans, notations, local codes and ordinances. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20207/20/20207/20/2020PPASS
DetailsMike Jordan
Looking for our final on the second and last phase.

Phone #: ###-#### Inspection requested via web by Drew Moorhouse
DOC - Permit Finaled7/20/20207/20/20207/20/2020PPASS
DetailsMike Jordan
BLD-Final7/9/20207/10/20207/10/2020ANR
DetailsMike Jordan
Looking for our final inspection in the 2nd (last phase). I would like to meet you onsite if possible.

Thanks,
Dana Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Needs to complete flooring. Everything else ok.
FIRE-Final Inspection7/8/20207/9/20207/9/2020APASS
DetailsTroy Cobbley
Life safety passed.

We are Looking for the fire/life safety final on the second and final phase of the project. I would like to meet you onsite if available.

Thanks
Dana McCarter ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
BLD-Framing/Rough-in6/3/20206/4/20206/4/2020APART
DetailsMike Jordan
I would like to meet you onsite to review.

Thanks,

Dana McCarter
###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Framing for phase 2 is ok. Architect will need to upload a plan mod for suite 120 and an additional permit for suite 200.
BLD-Final5/27/20205/27/20205/27/2020PPART
DetailsMike Jordan
We are looking for a final for phase one.
I would like to meet you there. Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Ok to occupy the two new exam rooms only.
FIRE-Final Inspection5/26/20205/27/20205/27/2020APART
DetailsTroy Cobbley
Life safety passed for Exam Rooms 1 and 2 which are phase 1.

We are trying to final out the first phase (two rooms) it order for the client to move to that side to be able to begin the second phase.

Thanks,
Dana Phone #: ###-#### Inspection requested via web by Drew Moorhouse
BLD-Final5/26/20205/26/20205/26/2020PNR
DetailsMike Jordan
We are Looking to final out two rooms as we are doing this TI in phases and the clients need to move over to this side to begin the next phase. I would like to meet you onsite to review.

Thanks,
Dana McCarter
###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Needs fire/life/safety first.
BLD-Framing/Rough-in4/1/20204/2/20204/2/2020APASS
DetailsMike Jordan
We are looking for a framing inspection on the first phase of the Ti. I am happy to meet onsite to review.
Thanks,
Drew Moorhouse
McCarter-Moothouse
###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Interior steel stud framed walls only for exam rooms 101 and 102.