BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Tennant. Noted that roof repair could not be completed due to 3 layers of shingles already in place. A non compliant item can not be repaired.
|
DOC - Permit Finaled | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Mike Jordan
|
|
|
striped all layers of existing material to bare deck per our discussion now need bare inspection prior to covering. Replaced the dry rotted 1x10 roof sheeting. Please come as early as possible repairs are completed as of Wednesday afternoon, shingles are on site. Thanks very much. Phone #: ###-#### Inspection requested via web by Scott Tennant
|
BLD-Conference | 7/1/2020 | 7/1/2020 | 7/1/2020 | A | DONE |
Mike Jordan
|
|
|
have a 3 layer roof need written conformation 3 layer roof must be striped to deck so asphalt shingles can be nailed to solid deck per code R905.2.1 and code R908.3.1.1 Phone #: ###-#### Inspection requested via web by Scott Tennant. On site to issue a correction notice notice. Per IRC sec. 908.3.1.1 item #3, roof recover is not allowed where the existing roof has two or more applications of any type of roof covering. Also noted roofers were removing all exisitng roof coverings down to shating while on site.
|