ELE-Aging Inspection | 5/15/2020 | 5/15/2020 | 5/18/2020 | | FAIL |
Daryl DeGrange
|
|
|
Left message of permit lacking final inspection
|
ELE-Aging Inspection | 2/14/2020 | 2/14/2020 | 2/19/2020 | | FAIL |
Rock A. Hudson
|
|
|
No progress to report. Waiting on owner.
|
ELE-Aging Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | | FAIL |
Rock A. Hudson
|
|
|
Slow moving job due to owner
|
ELE-Aging Inspection | 8/16/2019 | 8/16/2019 | 8/22/2019 | | FAIL |
Rock A. Hudson
|
|
|
slow moving job. Waiting on contractor
|
ELE-Aging Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | FAIL |
Rock A. Hudson
|
|
|
Waiting for responce an status.
|
ELE-Aging Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | | FAIL |
Rock A. Hudson
|
|
|
Sent text to contact in morning, waited all day for response. No return message.
|
ELE-Request for Extension | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Rock A. Hudson
|
|
|
Kevin Phone #: ###-#### Spoke with contractor just slow moving job due to owner.
|
Electrical Rough-In | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin Phone #: ###-#### grounding electrode and equipotential bond ok to pour slab
|
Electrical Rough-In | 7/10/2015 | 7/13/2015 | 7/13/2015 | P | NR |
Rex Boyles
|
|
|
Kevin Phone #: ###-#### Called and askedkevin what we are inspecting. He said grounding electrode in pool pump bldg. and equipotential plane bond. No ufer to look at yet because no stemwall form built yet and equipotintial wire already buried and not visable. NOTE:underground ok at last inspection as per Eric S.
|
Electrical Rough-In | 7/7/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Eric Story
|
|
|
pool bonding and underground cover Phone #: ###-#### Inspection requested via web by Kevin Koomler pool bonding ok
|