ELE-Aging Inspection | 7/6/2020 | 7/6/2020 | 7/6/2020 | | PEND |
Daryl DeGrange
|
|
|
This permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If your job is complete, Please schedule an final inspection online, pdsonline.cityofboise.org Thank You!
|
ELE-Aging Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 | | DONE |
Daryl DeGrange
|
|
|
Pursuant of contacting aging permit applicants is on hold until required social distancing has been removed
|
ELE-Aging Inspection | 10/23/2019 | 10/23/2019 | 10/24/2019 | | DONE |
Eric Story
|
|
|
Still waiting on owner
|
ELE-Aging Inspection | 6/17/2019 | 6/17/2019 | 6/18/2019 | | DONE |
Eric Story
|
|
|
Owner will schedule for final as work is complete
|
Final | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | NR |
Rock A. Hudson
|
|
|
i installed 2nd ground rod and Noalox compound. Please come as soon as possible. Idaho power is coming on 8/23 to connect transformer to panel. Thank you for your time Phone #: ###-#### Inspection requested via web by alfredo arteaga Needed p/s inspection Service added to garage. All branch circuits have not been pulled yet.
|
Permanent Service | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Rock A. Hudson
|
|
|
i installed 2nd ground rod and Noalox compound. Please come as soon as possible. Idaho power is coming on 8/23 to connect transformer to panel. Thank you for your time Phone #: ###-#### Inspection requested via web by alfredo arteaga p/s o/h n ok
|
Final | 8/18/2016 | 8/22/2016 | 8/22/2016 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by alfredo arteaga Needed permanent service inspection
|
Permanent Service | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by alfredo arteaga 110.14- Aluminum conductors shal be coated with a oxide inhibitor when terminated. 250.53(A)(1)- Where rod is used as grounding electrode system it shall be supplemented by an additional rod.
|