ELE-Aging Inspection | 6/18/2019 | 6/18/2019 | 6/19/2019 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Final | 6/19/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Daryl DeGrange
|
|
|
Job completed by ELE16-02855 Final ok
|
ELE-Aging Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | | DONE |
Mark Moncarr
|
|
|
Talked to Andy on 3/19 at 8:830am. He is going to try to coordinate and schedule a final.
|
Electrical Rough-In | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Mark Moncarr
|
|
|
Altenergy Jesse ###-#### is my contact, job is done on my end. Phone #: ###-#### Inspection requested via web by Andy Derrick rough in ok
|