Information based on query as of Tuesday, May 7, 2024.
Permit Information
Permit NumberELE17-02412
StatusIssued
Name SNYDERMAN DAVID A
Site Address 1414 N 15TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
residential remodel-12/1/17 customer came in and added a pump fixture for the shower
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In6/11/20206/12/20206/12/2020APASS
DetailsRock A. Hudson
screened // David Phone #: ###-####
Looked at down storage under stair, it is to remain open. Strite Construction to take over job and complete stairway and addition. Discussed closet shelf clearances. Up bed closet and pantry rough in ok cover
ELE-Aging Inspection6/4/20206/4/20206/4/2020 PEND
DetailsDaryl DeGrange
Still under construction
ELE-Aging Inspection3/5/20203/5/20203/11/2020 DONE
DetailsMark Moncarr
Please call the city and request an extension if more time is needed.
Conference12/5/201912/6/201912/6/2019ADONE
DetailsMark Moncarr
I wanted to get the project and permit back on track. The last time it was inspected was at the electrical rough in. The bathroom is finished but the hall way is not and I wanted to discuss the best way to manage the permit and continue the work. Thanks. Phone #: ###-#### Inspection requested via web by David Snyderman Discussed timeline of work being done. Work is still in progress. If needs another extension I said I would allow it.
ELE-Aging Inspection10/21/201910/21/201910/28/2019 DONE
DetailsMark Moncarr
Schedule a final inspection.
ELE-Request for Extension7/22/20197/22/20197/22/2019PPASS
DetailsDaryl DeGrange
Requested extension ok, job still under construction
ELE-Aging Inspection6/28/20196/28/20197/3/2019 PASS
DetailsMark Moncarr
Please call with progress on project, or schedule a final inspection.
Electrical Rough-In8/12/20188/13/20188/13/2018APASS
DetailsMark Moncarr
repeat rough in inspection on basement bathroom (removed external bathroom switches and outlet to a different circuit). Phone #: ###-#### Inspection requested via web by David Snyderman Ok cover down bath.
Electrical Rough-In8/9/20188/10/20188/10/2018PPASS
DetailsMark Moncarr
I would like the bathroom part of the project reviewed and if acceptable start putting up the dry wall in that area. Phone #: ###-#### Inspection requested via web by David Snyderman Ok cover down bath.
Conference8/3/20178/4/20178/4/2017PDONE
DetailsMark Moncarr
David Phone #: ###-#### Con on new stair relocation, and a few additions to down bath. Also up bed closet to be moved.