Final | 2/4/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Rock A. Hudson
|
|
|
TCO on 5TH floor deck and sign off on final Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Oirginal permit not provided, signed all TCO sheets for final. Final ok
|
Final | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PART |
Rock A. Hudson
|
|
|
TCO Plaza park area front of building Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Phase 4 TCO ok
|
Final | 11/30/2018 | 11/30/2018 | 11/30/2018 | A | PART |
Rock A. Hudson
|
|
|
Units 110 , 111 , 112 Phone #: ###-#### Inspection requested via web by Tom Betty Phase 2- level 1 loft units 110 thru 115 TCO ok. Phase 5- Garage TCO ok.
|
Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | A | NR |
Rock A. Hudson
|
|
|
Units 110 , 111 , 112 , 113 , 114 , 115 and Garage Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 113, 114, 115 checked ok, 110, 111, 112 no access, a barrier shall be in place in garage for feeders.
|
Final | 11/14/2018 | 11/14/2018 | 11/14/2018 | A | PART |
Rock A. Hudson
|
|
|
Reinspect roof,arc fault 313 ,Inspect first level parking condensors Phone #: ###-#### Inspection requested via web by Tom Betty No card on site... it had been taken to ACHD. 213 had bad AFCI- ok, trash room fan- ok, 1st fl. wire for hand dryer blanked-ok. Phase 1 TCO ok
|
Final | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | FAIL |
Daryl DeGrange
|
|
|
All 2ND Floor storage, comm rm , hallway and units 201,202,203,204,205,206,207,208,209,210,211,212,213,214,215,216,217,218,219.,Stairwell#1 and Stairwell#2,1st Floor Lobby,Bathrm, Trash rm,Bike rm,Sprinkler riser rm, mail rm, Move in rm and roof top condenser units Phone #: 573- 1573 Inspection requested via web by Tom Betty All corrections listed are for roof top mini split systems. 330.6- All connectors used on coated MC cable shall be listed and identified for use. 725.3(J)- Bushings shall be provided and properly installed for all wiring marked class 2R. 725.124- Class 2 power sources shall be clearly marked. Measured 208 volts on terminal with class 2 wiring connected. As per Daryl DeGrange wiring marked class 3 ok due to documentation found on Southwire web site deffinition and explanation.
|
Final | 11/8/2018 | 11/8/2018 | 11/8/2018 | A | PART |
Rock A. Hudson
|
|
|
3rd floor Hall,Storage , comm rm and Units 301 , 302 , 303 , 304 , 305 , 306 , 307 , 308 , 309 , 310 , 311 , 312 , 313 , 314 , 315 , 316 , 317 , 318 , 319 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 301- 250.52- walls 24" and wider shall have a receptacle outlet installed in bedroom. 309- 210.52(A)- Receptacles required by this article shall be energized continuously. Permitted switched receptacles shall only switch 1/2 of receptacle. Corridor comm room- 408.4- Circuit directory shall be complete for panel in this room. 302, 303, 304, 305, 306, 307, 308, 310, 311, 312, 313, 314, 315, 316, 317, 317, 318, 319, corridor and storage rooms TCO ok
|
Electrical Rough-In | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Rock A. Hudson
|
|
|
Some underground on east end of building,Hello Rock missed calling in for an AM but it is ready if you could make it early Thanks Craig Phone #: ###-#### Inspection requested via web by Tom Betty rough in ok cover
|
Final | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Rock A. Hudson
|
|
|
reinspect units 504 , 505 506 ,508 , 510 , 511 , 513 and inspect 4th floor storage, comm and units 401 , 402 , 403 , 404 , 405 , 406 , 407 , 408 , 409 , 410 , 411 , 412 , 413 , 414 , 415 , 416 , 417 , 418 , 419 Phone #: ###-#### Inspection requested via web by Tom Betty Storage damper wiring 12-2 MC not wired, missing covers in corridor, 402, 403, 405. All others noted TCO ok
|
Final | 10/29/2018 | 10/31/2018 | 10/31/2018 | A | PART |
Rock A. Hudson
|
|
|
Finals for units on 5th floor ,hallway and storage rooms, Units 502 thru 519 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 314.20- Interior of boxes shall not be exposed to combustible materials. 504 disposal located pert behind cabinet divider. 506 microwave receptacle located part behind divider. 110.3- All siring shall be terminated as per drawing and manufacturers instructions. 505 3 bed receptacles not working, 508,510,513 all have 2 single pole switches controlling living room lights, 511 open ground in living room receptacle. 502, 503, 507, 509, 512, 514, 515, 516, 517, 518, 519 rooms only TCO ok
|
Electrical Rough-In | 10/30/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Rock A. Hudson
|
|
|
Drop ceiling office and ground work front of building Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty North central underground and office drop lid rough in ok cover
|
Electrical Rough-In | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Rock A. Hudson
|
|
|
Underground conduit for street pole lighting Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Informed to be sure to call public works about street light installation. Idaho street west pole base and underground rough in ok cover.
|
Electrical Rough-In | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
First floor drop ceilings Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Level 1 mail bax hall, bath, lobby hardlid rough in ok cover
|
Electrical Rough-In | 10/23/2018 | 10/23/2018 | 10/23/2018 | A | CANC |
Rock A. Hudson
|
|
|
First floor drop ceilings Call Craig Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Tom Betty
|
Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Rock A. Hudson
|
|
|
Garage ceiling for insulation Phone #: ###-#### Inspection requested via web by Tom Betty NEC 330.30 and 110.27- MC cable shall not be installed where subject to physical damage. Just outside meter area is a lower section of ceiling where MC located between 6'6" and 7'. If located below striker height this area shall be protected from damage from traffic and pedestrian traffic by fencing off. Area of ceiling in parking garage ok to insulate.
|
Electrical Rough-In | 10/9/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Rock A. Hudson
|
|
|
drop ceiling 112 Phone #: ###-#### Inspection requested via web by Tom Betty Room noted drop lids rough in ok cover
|
Electrical Rough-In | 10/3/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Rock A. Hudson
|
|
|
Drop ceilings 110 , 111 , 112 , 113 . 114 , 115 Phone #: ###-#### Inspection requested via web by Tom Betty 112 not ready, rest noted drop lids rough in ok cover
|
Permanent Service | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Rock A. Hudson
|
|
|
Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 86,448 AIC value provided on print. p/s u/g n ok
|
Electrical Rough-In | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Rock A. Hudson
|
|
|
Drop ceiling 201 ,202 , 203 , 204 , 205 , 206 , 207 , 208 , 209 , 210 , 211 , 212 ,213 , 214 , 215 , 216 , 217 , 218 , 219 , hallways , storage rooms and comm room mezzanine Phone #: ###-#### Inspection requested via web by Tom Betty Fire caulking not complete, Areas noted drop lids rough in ok cover
|
Electrical Rough-In | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Rock A. Hudson
|
|
|
Lobby,storage , bike room , trash room . etc rest of 1st floor Phone #: ###-#### Inspection requested via web by Tom Betty Areas noted plus mail rm, and move in room, vanilla TI space rough in ok cover
|
Electrical Rough-In | 8/10/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Eric Story
|
|
|
Drop ceilings 301 ,302 , 303, 304 , 305 , 306 , 307 , 308 , 309 ,310 , 311 , 312 , 313 , 314 , 315 , 316 , 317 , 318 , 319 , storage and 3rd floor hallway call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units 301-319 and hallway drop ceilings as well as storage ok to cover
|
Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Rock A. Hudson
|
|
|
drop ceiling 401 sorry Rock this is the only unit they need inspected they finally put fan in bath room just hate to waste your time on one unit Phone #: ###-#### Inspection requested via web by Tom Betty Room noted drop lids rough in ok cover
|
Electrical Rough-In | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Rock A. Hudson
|
|
|
Drop ceilings hallway 4th floor Phone #: ###-#### Inspection requested via web by Tom Betty Corridor and storage room drop lids rough in ok cover.
|
Electrical Rough-In | 7/30/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Rock A. Hudson
|
|
|
5TH floor hallway drop ceilings Phone #: ###-#### Inspection requested via web by Tom Betty Misc storage rooms to have surface mount luminaires. OK Corridor drop lids rough in ok cover.
|
Electrical Rough-In | 7/26/2018 | 7/26/2018 | 7/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
Unit 113 and drop ceilings 401 , 409 , 411 , 412 , 413 , 414 , 415 , 416 Phone #: ###-#### Inspection requested via web by Tom Betty 401 not ready,409 thru 416 drop lids, unit 113 rough in ok cover
|
Electrical Rough-In | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Rock A. Hudson
|
|
|
units 115 , 110 , 111 and dog wash Phone #: ###-#### Inspection requested via web by Tom Betty Rooms noted rough in ok cover
|
Electrical Rough-In | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Drop ceilings 401, 402 , 403 , 404 , 405 , 406 , 407 , 408 , 410 , 417 ,418 and Phone #: ###-#### Inspection requested via web by Tom Betty 401, 410 not ready, rest of rooms noted and added 419 drop lid rough in ok cover
|
Electrical Rough-In | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Rock A. Hudson
|
|
|
units 113 , 114 and stairs #1 and #2 , 2nd and first floor Phone #: ###-#### Inspection requested via web by Tom Betty Rooms and areas noted rough in ok cover
|
Electrical Rough-In | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Rock A. Hudson
|
|
|
Units 212 , 213 , 214 2nd floor hallway ,storage and drop ceilings 512 , 513 , 514 , 515 , 516 Phone #: ###-#### Inspection requested via web by Tom Betty Areas and rooms as noted rough in ok cover
|
Electrical Rough-In | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | CANC |
Rock A. Hudson
|
|
|
Units 212 , 213 , 214 , drop ceilings 512 , 513 , 514 , 515 ,516 Call Craig Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Tom Betty
|
Electrical Rough-In | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Rock A. Hudson
|
|
|
units 209 , 210 , 211 , 216 , 215 and drop ceilings 510 , 511 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Discussed location of HVAC disconnects for mini split unit located 10' above grade. Fused disconnects require minimum work space due to servicing fuses. Non fused disconnects do not require work space. Rooms and hard lids noted rough in ok cover
|
Electrical Rough-In | 7/12/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Rock A. Hudson
|
|
|
units 205 , 206 , 207 , 208 , 217 drop ceilings 502 , 503 , 504 , 505 , 506 , 507 , 508 , 509 , 517 , 518 , 519 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Informed elevator contractor needs city permit to continue installation. As noted rough in ok cover
|
Electrical Rough-In | 7/10/2018 | 7/10/2018 | 7/10/2018 | A | PART |
Rock A. Hudson
|
|
|
units 201 , 202 , 203 , 204 , 205 , 219 , 218 ,313 , 314 , 315 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 205 not ready, rest of rooms noted rough in ok cover
|
Electrical Rough-In | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Rock A. Hudson
|
|
|
units 309 , 310 , 311 , 312 , 316 , hallway , and storage Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Rooms and areas noted rough in ok cover
|
Electrical Rough-In | 7/3/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Rock A. Hudson
|
|
|
301 , 302 , 303 , 304 , 305 , 306 , 307 , 308 , 317 , 318 , 319 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Rooms noted rough in ok cover
|
Electrical Rough-In | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 412 , 413 ,414 , 415 Phone #: ###-#### Inspection requested via web by Tom Betty Rooms noted rough in ok cover.
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 409 , 410 , 411 , 416 and stairs 4th floor Phone #: ###-#### Inspection requested via web by Tom Betty Rooms noted rough in ok cover
|
Electrical Rough-In | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 404 , 408 ,Hallway , storage ,comm rm and re inspect 405 , 406 Phone #: ###-#### Inspection requested via web by Tom Betty Informed next trip will be turned down for make up not totally rolled in boxes subject to damage, stapling on edge, installation not in a neat workman like manner. Rooms noted rough in ok cover
|
Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 | A | PART |
Rock A. Hudson
|
|
|
units 401 , 402 , 403 , 405 , 406 , 407 , 419 , 418 and 419 Phone #: ###-#### Inspection requested via web by Tom Betty 110.14(B)- All equipment grounding conductors shall be spliced for inspection at rough in inspection. Splicing shall be completed by using a listed connector. 405 and 406 switches, equipment grounds twisted together with no connector, receptacle locations just rolled in boxes. 401, 402, 403, 407, 417, 418, 419 only rough in ok cover
|
Electrical Rough-In | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 513 , 514 and 5th floor stairs #1 and #2 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Areas noted and elevator dog house stub rough in ok cover. Left green tag on electrical office door.
|
Electrical Rough-In | 6/13/2018 | 6/13/2018 | 6/13/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 502 , 503 , 504 , 512 , 515 , 516 , 517 , 518 , 519 , elevator equipment room , trash rm , storage rms and 5th floor hallway call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Areas noted walls and fire lids rough in ok cover
|
Electrical Rough-In | 6/7/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Rock A. Hudson
|
|
|
Units 508 , 509 , 510 , 511 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Added 505, 506, 507 and other listed rough in ok cover
|
Electrical Rough-In | 5/24/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Rock A. Hudson
|
|
|
Parapet wall on roof Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Parapet UF run between stubs due to roof not dryed in yet. rough in ok cover
|
Electrical Rough-In | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Rock A. Hudson
|
|
|
PT deck concrete pour call craig Phone #: ###-#### Inspection requested via web by Tom Betty Discussed the use of NM cable for floors 1 thru 5 which are wood construction, type 3, 4, and 5 construction NM cables permitted as long as behind 15 minute barrier or greater and not above suspended ceilings. PT deck east 1/2 pour rough in ok cover.
|
Electrical Rough-In | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PART |
Daryl DeGrange
|
|
|
Look at PT deck rough-in Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Rough-in ok cover west half
|
Electrical Rough-In | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Rock A. Hudson
|
|
|
Ground work and east wall Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Lower level underground and east wall rough in ok cover
|
Electrical Rough-In | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Rock A. Hudson
|
|
|
Basement poured concrete walls south and stairwell #1 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Area noted rough in ok cover
|
Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Rock A. Hudson
|
|
|
UFER grounding Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Concrete encased electrode and N.W. basement wall pour rough in ok cover.
|