Final | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Rock A. Hudson
|
|
|
Justin Johnston...###-#### Phone #: ###-#### Inspection requested via web by Tom Jenkins Final ok
|
Final | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PART |
Rock A. Hudson
|
|
|
Temp final for training inspection. Please make it later in the afternoon after 3 if possible or if necessary. Phone #: ###-#### Inspection requested via web by Tom Jenkins All GFCI protection in place an tested OK. Signed TCO line on card.
|
Conference | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | DONE |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Discussed and double checked all requirement for temp occupancy. All 1,2,3 pole receptacles shall have GFCI protection or be hard wired with disconnecting means installed. If this cannot be accomplished all power to the receptacles for the appliances needing GFCI protection shall be diconnected or be locked out so appliance cannot be used until code compliant.
|
Final | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | CANC |
Rock A. Hudson
|
|
|
Temp final Phone #: ###-#### >> Inspection requested via web by Tom Jenkins Inspection cancelled from web by: Tom Jenkins
|
Final | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Temp final Phone #: ###-#### Inspection requested via web by Tom Jenkins 210.8(B)- Other Than Dwelling Units. All single-phase receptacles rated 150 volts to ground or less, 50 amperes or less and threephase receptacles rated 150 volts to ground or less, 100 amperes or less installed in the following locations shall have ground-fault circuit-interrupter protection for personnel. Multilple in kitchen area.
|
Electrical Rough-In | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins North underground under sidewalk for lights
|
Electrical Rough-In | 6/30/2018 | 6/30/2018 | 6/30/2018 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling ###-####. Boarder tiles removed, Thak you. Grid rough in ok cover
|
Electrical Rough-In | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Ceiling cover. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins BCC 4 05 17- It shall be unlawful to cover electrical wiring prior to inspection. Grid boarders remove and recall
|
Permanent Service | 6/25/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins p/s u/g n ok
|
Electrical Rough-In | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Underground west side to light and sign locations rough in ok cover.
|
Electrical Rough-In | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Menu board bases rough in ok cover
|
Electrical Rough-In | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Rock A. Hudson
|
|
|
Pole bases Phone #: ###-#### Inspection requested via web by Tom Jenkins Pole bases rough in ok cover
|
Electrical Rough-In | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Out front soffit ceiling rough in ok cover
|
Electrical Rough-In | 5/16/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
James Ady
|
|
|
Ceiling Cover Phone #: ###-#### Inspection requested via web by Tom Jenkins cans had not been wired but, all j box covers were in place at time of inspection hard lid areas only ok to cover
|
Electrical Rough-In | 5/8/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins All walls complete wall rough in ok cover
|
Electrical Rough-In | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | PART |
Rock A. Hudson
|
|
|
Wall inspections Phone #: ###-#### Inspection requested via web by Tom Jenkins Bread room, serving window area, back house, bathroom walls noted rough in ok cover
|
Electrical Rough-In | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
Exterior wall inspection. Phone #: ###-#### Inspection requested via web by Tom Jenkins Exterior walls only rough in ok cover
|
Conference | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | FAIL |
Rock A. Hudson
|
|
|
110.9 Interrupting Rating. Equipment intended to interrupt current at fault levels shall have an interrupting rating at nominal circuit voltage at least equal to the current that is available at the line terminals of the equipment. Equipment intended to interrupt current at other than fault levels shall have an interrupting rating at nominal circuit voltage at least equal to the current that must be interrupted. NEC 110.10- Circuit Impedance, Short-Circuit Current Ratings, and Other Characteristics. The overcurrent protective devices, the total impedance, the equipment short-circuit current ratings, and other characteristics of the circuit to be protected shall be selected and coordinated to permit the circuit protective devices used to clear a fault to do so without extensive damage to the electrical equipment of the circuit. This fault shall beassumed to be either between two or more of the circuit conductors or between any circuit conductor and the equipment grounding conductor(s) permitted in 250.118. Listed equipment applied in accordance with their listing shall be considered to meet the requirements of this section. On 3-12-18 checked available short circuit current off service located on property to sub-gear at structure being built using Eaton FC2 available fault current calculator. Available fault current at main disconnecting means, 62,561 amps, 75' to building equipment, 2 parallel runs of 600 kcmil copper conductors. App states total available short circuit current at building equipment is 36,867 amps and 10k rated branch circuit overcurrent devices. Please submit back to engineer for correction. Must see documentation of correction of available short circuit values.
|
Electrical Rough-In | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Rock A. Hudson
|
|
|
Slab inspection. Early afternoon if possible. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Under slab rough in ok cover
|
Electrical Rough-In | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Rock A. Hudson
|
|
|
Underground inspection Phone #: ###-#### Inspection requested via web by Tom Jenkins Feeder underground conduits rough in ok cover
|
Conference | 2/28/2018 | 3/7/2018 | 3/6/2018 | A | DONE |
Rock A. Hudson
|
|
|
Verify 30 amp receptacle in spider box and other have GFCI protection at ploe or at spider box. If GFCI is absent order cord to be removed forn temp power suppy. pole checked on 3-2-18 ok
|
Electrical Rough-In | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Eric Story
|
|
|
Check 30 amp at spider box for GFCI protection ###-#### GFCI protection fixed in temp power
|
Electrical Rough-In | 2/27/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Rock A. Hudson
|
|
|
Ufer Phone #: ###-#### Inspection requested via web by Tom Jenkins Concrete encased electrode rough in ok cover
|
Electrical Rough-In | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Ufer Phone #: ###-#### Inspection requested via web by Tom Jenkins 590.6(B)- Receptacles other than 120 volt used for temp power shall have GFCI protection. 30 amp spider box.
|
Electrical Rough-In | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
Sleeves under footing forms. Phone #: ###-#### Inspection requested via web by Tom Jenkins Check temp power to spider box 30 amp receptacle on spider box no GFCI prtection. Underground as noted rough in ok cover
|
Electrical Rough-In | 3/2/2018 | 3/2/2018 | | P | |
Jim Little
|
|
|
Correction made to temp power pole. Thank you Phone #: ###-#### >> Inspection requested via web by Tom Jenkins
|