Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Eric Story
|
|
|
please call 1 hour prior to the inspection at ###-#### Phone #: ###-#### Inspection requested via web by Vitaliy Berezin Occ card not on site Corrections fixed final ok
|
Final | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | FAIL |
James Ady
|
|
|
please call 1 hour prior to the inspection at ###-#### Phone #: ###-#### Inspection requested via web by Vitaliy Berezin 210.8. All 120v receps ins a comercial kitchen shall be GFCI protected. 210.63. Service recep required for refridgeration equipment.(Outdoor walk in cooler)
|
Permanent Service | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Vitaliy Berezin AFC calc is L,L @2,240 amps, Main is rated at 10K p/s o/h rec ok
|
Rough-In Permanent Service | 8/15/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Eric Story
|
|
|
please call 1 hour prior to the inspection at ###-####474 Phone #: ###-#### Inspection requested via web by Vitaliy Berezin Walls only ok to cover
|