Final | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper Ok fnal.
|
Final | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PART |
Rock A. Hudson
|
|
|
2nd floor final Phone #: ###-#### Inspection requested via web by steve cooper Unit 212 right edge of kitchen counter lower cabinet covers receptacle and has no access. Will check next trip. Level 2 TCO ok
|
Final | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | FAIL |
James Ady
|
|
|
second floor final Phone #: ###-#### Inspection requested via web by steve cooper No answer at number and unable to leave message. Panel blanks needed in rm.222. Exit sign next to stairs does not work. (Boxes shall be accessable as per 314.29 Rm 212 Recep at end of kitchen counter)
|
Final | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | PART |
Mark Moncarr
|
|
|
3rd and 4th floor final Phone #: ###-#### Inspection requested via web by steve cooper Partial 3-4 floors only.
|
Final | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | NR |
Mark Moncarr
|
|
|
3rd floor final Phone #: ###-#### Inspection requested via web by steve cooper Will do partial final on floors 3-4 monday the 8th.
|
Conference | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | DONE |
Mark Moncarr
|
|
|
1st floor hallway drop ceilings Phone #: ###-#### Inspection requested via web by steve cooper Discussed locations of access covers for in ceiling j-boxes.
|
Electrical Rough-In | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Mark Moncarr
|
|
|
1 st floor main commons drop ceiling. Please call Chris at the number listed in request Phone #: ###-#### Inspection requested via web by steve cooper Ok cover common middle first floor.
|
Electrical Rough-In | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | FAIL |
Mark Moncarr
|
|
|
main commons drop cielling Phone #: ###-#### Inspection requested via web by steve cooper I dont know everything that I need to look at. The number listed for contact has been called multiple times with messages left. I have never had a return phone call to date from this number. I need the electricians contact info for future inspections to be done.
|
Permanent Service | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by steve cooper p/s u/g n ok
|
Electrical Rough-In | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Mark Moncarr
|
|
|
2nd and 3rd floor drop cielings Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 2,3 floor corridor ceilings.
|
Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Mark Moncarr
|
|
|
drop ceiling 4th floor in the hallways and the 3rd floor unit drop ceilings in the units Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor hall, and 2nd floor unit ceilings. Junction box in ceiling 4th floor near E stairwell needs to be accessible upon final. Junction box was needed to fix heat tape that was cut. Also reminded electrician that a KO seal is needed for panel in rm 411.
|
Electrical Rough-In | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Mark Moncarr
|
|
|
3rd floor drop ceilings, first floor cover please call Chris ###-#### to walk through with you Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 3rd floor drop ceilings, and 1st floor. Ground screws needed in media panels 1st floor.
|
Electrical Rough-In | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Mark Moncarr
|
|
|
3 and 4th floor drop ceilings 1st floor rough Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor ONLY ceilings in all units. KO seal needed in unit 411. Call 3rd floor in when ready.
|
Electrical Rough-In | 7/6/2018 | 7/9/2018 | 7/9/2018 | A | PASS |
Mark Moncarr
|
|
|
2nd floor Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 2nd floor rms 201-212, stairwells and corridors.
|
Electrical Rough-In | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | NR |
Mark Moncarr
|
|
|
2nd floor Phone #: ###-#### Inspection requested via web by steve cooper
|
Electrical Rough-In | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Mark Moncarr
|
|
|
3rd floor rough and approve to cover Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 3rd floor rms 301-312 and stairwells.
|
Electrical Rough-In | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Mark Moncarr
|
|
|
4th floor Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor rms 401-412, 4th floor cooridor and stairwells. 4th floor trash rm and laundry to be put on 3rd floor inspection when requested.
|
Electrical Rough-In | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | NR |
Mark Moncarr
|
|
|
4th floor units Phone #: ###-#### Inspection requested via web by steve cooper Going to be called back in for monday. Nail plates need done, grd screws for media panels, and misc. boxes to be made up.
|