Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberELE18-01558
StatusFinaled
Name POWERBOUND ELECTRIC INC
Site Address 2200 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
New: new construction
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/31/201810/31/201810/31/2018PPASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by steve cooper Ok fnal.
Final10/11/201810/12/201810/12/2018APART
DetailsRock A. Hudson
2nd floor final Phone #: ###-#### Inspection requested via web by steve cooper Unit 212 right edge of kitchen counter lower cabinet covers receptacle and has no access. Will check next trip.
Level 2 TCO ok
Final10/10/201810/11/201810/11/2018AFAIL
DetailsJames Ady
second floor final Phone #: ###-#### Inspection requested via web by steve cooper No answer at number and unable to leave message. Panel blanks needed in rm.222. Exit sign next to stairs does not work. (Boxes shall be accessable as per 314.29 Rm 212 Recep at end of kitchen counter)
Final10/5/201810/8/201810/8/2018APART
DetailsMark Moncarr
3rd and 4th floor final Phone #: ###-#### Inspection requested via web by steve cooper Partial 3-4 floors only.
Final10/5/201810/5/201810/5/2018PNR
DetailsMark Moncarr
3rd floor final Phone #: ###-#### Inspection requested via web by steve cooper Will do partial final on floors 3-4 monday the 8th.
Conference9/6/20189/6/20189/6/2018PDONE
DetailsMark Moncarr
1st floor hallway drop ceilings Phone #: ###-#### Inspection requested via web by steve cooper Discussed locations of access covers for in ceiling j-boxes.
Electrical Rough-In8/27/20188/28/20188/28/2018APASS
DetailsMark Moncarr
1 st floor main commons drop ceiling. Please call Chris at the number listed in request Phone #: ###-#### Inspection requested via web by steve cooper Ok cover common middle first floor.
Electrical Rough-In8/27/20188/27/20188/27/2018PFAIL
DetailsMark Moncarr
main commons drop cielling Phone #: ###-#### Inspection requested via web by steve cooper I dont know everything that I need to look at. The number listed for contact has been called multiple times with messages left. I have never had a return phone call to date from this number. I need the electricians contact info for future inspections to be done.
Permanent Service8/16/20188/16/20188/16/2018PPASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by steve cooper p/s u/g n ok
Electrical Rough-In8/14/20188/14/20188/14/2018PPASS
DetailsMark Moncarr
2nd and 3rd floor drop cielings Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 2,3 floor corridor ceilings.
Electrical Rough-In8/7/20188/8/20188/8/2018APASS
DetailsMark Moncarr
drop ceiling 4th floor in the hallways and the 3rd floor unit drop ceilings in the units Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor hall, and 2nd floor unit ceilings. Junction box in ceiling 4th floor near E stairwell needs to be accessible upon final. Junction box was needed to fix heat tape that was cut. Also reminded electrician that a KO seal is needed for panel in rm 411.
Electrical Rough-In8/1/20188/1/20188/1/2018PPASS
DetailsMark Moncarr
3rd floor drop ceilings, first floor cover
please call Chris ###-#### to walk through with you Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 3rd floor drop ceilings, and 1st floor. Ground screws needed in media panels 1st floor.
Electrical Rough-In7/25/20187/25/20187/25/2018PPASS
DetailsMark Moncarr
3 and 4th floor drop ceilings
1st floor rough
Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor ONLY ceilings in all units. KO seal needed in unit 411. Call 3rd floor in when ready.
Electrical Rough-In7/6/20187/9/20187/9/2018APASS
DetailsMark Moncarr
2nd floor Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 2nd floor rms 201-212, stairwells and corridors.
Electrical Rough-In7/5/20187/5/20187/5/2018PNR
DetailsMark Moncarr
2nd floor Phone #: ###-#### Inspection requested via web by steve cooper
Electrical Rough-In6/27/20186/28/20186/28/2018PPASS
DetailsMark Moncarr
3rd floor rough and approve to cover Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 3rd floor rms 301-312 and stairwells.
Electrical Rough-In6/19/20186/19/20186/19/2018PPASS
DetailsMark Moncarr
4th floor Phone #: ###-#### Inspection requested via web by steve cooper Ok cover 4th floor rms 401-412, 4th floor cooridor and stairwells. 4th floor trash rm and laundry to be put on 3rd floor inspection when requested.
Electrical Rough-In6/14/20186/15/20186/15/2018ANR
DetailsMark Moncarr
4th floor units Phone #: ###-#### Inspection requested via web by steve cooper Going to be called back in for monday. Nail plates need done, grd screws for media panels, and misc. boxes to be made up.