Final | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Mark Moncarr
|
|
|
general contractor will be there all day. Phone #: ###-#### Inspection requested via web by todd cline Ok final.
|
Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Rock A. Hudson
|
|
|
Requesting a rough in inspection. There was a change to the layout. The homeowner wanted a wall added and the light in the laundry room had to be separated from the mud room. We added a switch for the laundry room plus an outlet. Thanks Todd Phone #: ###-#### Inspection requested via web by todd cline Laundry/ mud wall rough in ok cover
|
Electrical Rough-In | 6/20/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Mark Moncarr
|
|
|
Frameing contractor should be there all day. Requesting an ok to cover Phone #: ###-#### Inspection requested via web by todd cline Ok cover kitch, utility, up bath. 2 gang junction box to be cut in cabinets on E wall, and also above refer will be 2 junction boxes that will be accessible.
|
Conference | 6/4/2018 | 6/4/2018 | 6/4/2018 | A | DONE |
Mark Moncarr
|
|
|
I would like to talk to you about some old wiring that we ran into and some possible solutions. Please give me a call about 30 minutes before you may get there, so I can come over. I will be in the area. Thanks Todd Cline Phone #: ###-#### Inspection requested via web by todd cline Discussed the removal of knob and tube wiring and install of new. Knob and tube wiring if junctioned, needs to be accessible.
|