Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Final ok
|
Electrical Rough-In | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Rock A. Hudson
|
|
|
Corbin Phone #: ###-#### Inspection requested via web by Tom Jenkins Mechanical closet walls rough in ok cover
|
Electrical Rough-In | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ceiling for foam rough in ok cover
|
Rough-In Permanent Service | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Service only at this time. 65k rated main @ 240 volt. p/s u/g n ok
|
Electrical Rough-In | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Rock A. Hudson
|
|
|
Block inspection Phone #: ###-#### Inspection requested via web by Tom Jenkins Block boxes rough in ok cover
|
Electrical Rough-In | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Rock A. Hudson
|
|
|
Uffer inspection. Please inspect before 2pm if possible. Phone #: ###-#### Inspection requested via web by Tom Jenkins Concrete encased electrode rough in ok cover
|
Electrical Rough-In | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Pad conduits Phone #: ###-#### Inspection requested via web by Tom Jenkins 314.29 Boxes, Conduit Bodies, and Handhole Enclosures to Be Accessible. Boxes, conduit bodies, and handhole enclosures shall be installed so that the wiring contained in them can be rendered accessible without removing any part of the building or structure or, in underground circuits, without excavating sidewalks, paving, earth, or other substance that is to be used to establish the finished grade. Ant eater pond actuators located too deep in ground box to be accessible.
|
Electrical Rough-In | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Rock A. Hudson
|
|
|
Inspect underground conduit Phone #: ###-#### Inspection requested via web by Tom Jenkins Underground along north fence, allow for repair of damaged 3/4" pvc. rough in ok cover
|
Electrical Rough-In | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins remaining underground between buildings ok to cover
|
Electrical Rough-In | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PART |
Rock A. Hudson
|
|
|
Underground cover Phone #: ###-#### Inspection requested via web by Tom Jenkins Utility underground conduits from transformer about 1/2 way to service location rough in ok cover.
|