Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by A.M.E. Office Final ok
|
Permanent Service | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by A.M.E. Office p/s u/g n ok
|
Electrical Rough-In | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Rock A. Hudson
|
|
|
call Dean with questions , this is for a lid cover inspection Phone #: ###-#### Inspection requested via web by A.M.E. Office ceiling rough in ok cover
|
Electrical Rough-In | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Rock A. Hudson
|
|
|
Dean Hunsperger is the contact person (electrician). He needs an underground inspection. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office Concrete encased electrode located on exterior of foundation stubbed out of footing on east side under 2" PVC shall be protected from weather and direct contact with earth. Electrical contractor to encase stub and connection in concrete to protect. Interior and 2" exterior underground rough in ok cover
|