Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
James Ady
|
|
|
Final for Building #8B Phone #: ###-#### Inspection requested via web by Stuart Welton Patial final only ok (exterior lighting fed from temp panel. Will be fed from Site lighting control panel once building is constructed.)
|
Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | NR |
James Ady
|
|
|
Final AM inspection for Building #8B. Phone #: ###-#### Inspection requested via web by Stuart Welton Not ready egress lights not operational.
|
Rough-In Permanent Service | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Stuart Welton Building rough in ok p/s u/g n ok
|
Electrical Rough-In | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
James Ady
|
|
|
Underground rough-in Phone #: ###-#### Inspection requested via web by Stuart Welton Building 8B underground from Main service to panel ok to cover
|
Electrical Rough-In | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
James Ady
|
|
|
Uffer Ground Phone #: ###-#### Inspection requested via web by Stuart Welton ufer only ok to cover
|