Permit Information
Permit NumberELE19-01948
StatusFinaled
Name MOUNTAIN POWER ELECT
Site Address 800 E PARK BLVD
Project Name 
Customer Number19-020
ePlanReviewNo
Description
New: Provide the Electrical work associated with the 3rd floor TI of the WGP 4 project.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/30/201910/31/201910/31/2019APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jason Parke All areas have been completed Final ok
Electrical Rough-In10/11/201910/14/201910/14/2019APASS
DetailsJames Ady
southwest office area furniture and ok to occupy
Final breakroom and bathrooms Phone #: ###-#### Inspection requested via web by Jason Parke SW office furniture ok Breakroom and bathrooms ok
Permanent Service10/8/201910/8/201910/8/2019PPART
DetailsJames Ady
Service inspection and review areas that are complete and ready for occupancy Phone #: ###-#### Inspection requested via web by Jason Parke 110.26C3. Personnel doors. Where equipment rated 800A or more that contain overcurrent devices. Personel doors shall open in the direction of egress and be equiped with listerd panic hardware.. (Bus duct electrical room.) NE and SE area cubicals checked and ready for final.
Conference10/1/201910/1/201910/1/2019PPASS
DetailsJames Ady
Furniture installed in northeast and east areas- ok to occupy Phone #: ###-#### Inspection requested via web by Jason Parke Talked about items needed for TCO (All life safety items need to be complete)
Electrical Rough-In9/26/20199/26/20199/26/2019APASS
DetailsJames Ady
Pre-final walk through of northwest and southwest cubicle and office areas
Hallway and breakroom ceilings Phone #: ###-#### Inspection requested via web by Jason Parke SW and NW offices, cubicle areas, conf rooms and reception area hot checked and ready for final Hall and Elevator lobby ceiling ok to cover.
Electrical Rough-In9/26/20199/26/20199/26/2019ACANC
DetailsJames Ady
Hallway and breakroom ceilings Phone #: ###-#### >> Inspection requested via web by Jason Parke Inspection cancelled from web by: Jason Parke
Electrical Rough-In9/16/20199/17/20199/17/2019APASS
DetailsJames Ady
Pre-inspection in preparation for desks and furniture.
East side offices and open area
Southeast side offices and open area Phone #: ###-#### Inspection requested via web by Jason Parke Areas listed have been Hot checked and are ready for furniture set up and final.
Electrical Rough-In9/10/20199/11/20199/11/2019APASS
DetailsJames Ady
Pre-inspection in preparation for desks and furniture Phone #: ###-#### Inspection requested via web by Jason Parke NE offices and open office areas ok to set up funiture.
Electrical Rough-In9/9/20199/10/20199/10/2019APASS
DetailsJames Ady
Northwest offices and open area ceilings Phone #: ###-#### Inspection requested via web by Jason Parke Areas listed ok to cover
Electrical Rough-In8/21/20198/21/20198/21/2019PPASS
DetailsRock A. Hudson
Southwest cubicle area and offices ceiling inspection
New wall in breakroom
Please contact Tom ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke Grid in area noted rough in ok cover
Electrical Rough-In8/20/20198/21/20198/21/2019APASS
DetailsRock A. Hudson
Please call Tom B. Phone #: ###-#### Inspection requested via web by Kevin Perez Break room stub wall, (1 receptacle), rough in ok cover
Electrical Rough-In8/9/20198/14/20198/14/2019APASS
DetailsJames Ady
Northeast offices, East and southeast offices and cubicle area ceilings. Please contact Tom at ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke NE open office ok. SE open office and E offices ceiling only ok to cover. Restroom Hard lid and walls ok to cover Note: Previous ceiling inspection Should have Been NE open office area.
Electrical Rough-In8/8/20198/9/20198/9/2019APASS
DetailsJames Ady
Ceiling cover inspection. Contact Tom at ###-#### Phone #: ###-#### Inspection requested via web by Jason Parke NW open offise area ok to cover. All open office area perimeter only ok to cover. NO FULL TILES.
Electrical Rough-In7/26/20197/26/20197/26/2019APASS
DetailsJames Ady
Bathroom area walls Phone #: ###-#### Inspection requested via web by Jason Parke Bathroom and New electrical room walls only ok to cover
Electrical Rough-In7/15/20197/16/20197/16/2019APASS
DetailsJames Ady
Wall rough-in at (2) drinking fountain locations. Phone #: ###-#### Inspection requested via web by Jason Parke N and S hall drinking fountains walls ok to cover
Electrical Rough-In6/20/20196/21/20196/21/2019APASS
DetailsJames Ady
IT Room wall rough in Phone #: ###-#### Inspection requested via web by Jason Parke IT room wall only ok to cover
Electrical Rough-In6/17/20196/18/20196/18/2019APASS
DetailsJames Ady
Conference room and Collaboration room walls Phone #: ###-#### Inspection requested via web by Jason Parke Walls only as marked on print ok to cover
Electrical Rough-In6/10/20196/10/20196/10/2019PPASS
DetailsJames Ady
Please call Jason upon arrival to gain access
###-#### Phone #: ###-#### Inspection requested via web by Jason Parke Rough in ok walls only as marked on print
Electrical Rough-In6/4/20196/4/20196/4/2019PPASS
DetailsRock A. Hudson
Access is limited. Please call Jason when you arrive in the lobby.
###-#### Phone #: ###-#### Inspection requested via web by Jason Parke
North and east walls as noted on contractor print rough in ok cover.