Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kirt Palmer...ok to final
|
Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Daryl DeGrange
|
|
|
If coming from East stay on Overland or parallel until Cloverdale, then follow GPS. (GPS takes a twisted route). Ready anytime after 07:30. Phone #: ###-#### Inspection requested via web by Kirt Palmer Rough-in ok cover CSA listed floor heat Master Bathroom
|
Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Tom Saunders
|
|
|
Available anytime after 7:30.
If no answer at door (Doorbell hard to hear from construction location) call ###-####. Phone #: ###-#### Inspection requested via web by Kirt Palmer.... ok to cover wall for new switch location and floor heat controller
|
Conference | 6/16/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Tom Saunders
|
|
|
Available after 7:00 AM Phone #: ###-#### Inspection requested via web by Kirt Palmer... discussed moving switches and wiring in tile heat...inline splices, GFCI protection of floor heat, and future inspections...competent in work
|