Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Tom Saunders
|
|
|
Doug Phone #: ###-####...required interior lighting, exterior lighting and outlet complete..ok to final
|
Electrical Rough-In | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Tom Saunders
|
|
|
Doug Phone #: ###-####... surface wiring of feed to shop..conduit inside and outside and attached to PVC already inspected discussed whats required to final permit..outlet, light inside, and light at each door at egress
|
Electrical Rough-In | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tom Saunders
|
|
|
Doug-conduit Phone #: ###-####... homeowner expressed may have contractor finish job...inspection is for cover of PVCconduit from house to shop...ok to cover
|
Conference | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Tom Saunders
|
|
|
KRUSE Phone #: ###-####... discussed wiring of shop underground and above ground requirements wiring material used pamphlet given...homeowner very knowledgeable...recommend second consult once building framed
|