Permit NumberELE19-03021
StatusFinaled
Name COMMERCIAL ELECTRIC INC
Site Address 9025 S FEDERAL WAY
Project NameScreen SPE - Suite #100
Customer Number 
ePlanReviewNo
Description
Full installation for new commerical building
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/4/20202/4/20202/4/2020PPASS
DetailsJames Ady
The cubicles were installed and the facility is ready for final inspection. Please call Paul if there are any questions ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean furniture set final ok
Final1/23/20201/23/20201/23/2020PPART
DetailsJames Ady
The fire alarm has been installed and the facility is ready for final inspection. Please contact Paul with any questions or issues ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean TCO only will need to call for Final after Cubicals have been set up.
Final1/13/20201/15/20201/15/2020PNR
DetailsJames Ady
We need a final inspection for office building SPE/David Berry. Please call Paul ###-#### when headed to project, or with any questions. Phone #: ###-#### Inspection requested via web by Joe McLean
Electrical Rough-In1/15/20201/15/20201/15/2020PPASS
DetailsJames Ady
We need a final inspection for office building SPE/David Berry. Please call Paul ###-#### when headed to project, or with any questions. Phone #: ###-#### Inspection requested via web by Joe McLean Disp. Pigtail, W/H Disc, Electrical room Switches.(Change OC sensor to Single pole.), IT room receps, E wall conference room Facing open office recep dead,Bath receps DOuble GFCI(Line side all GFCIS), Spark rings needed on Restroom switches, NE T.I space recep RT of sink GFCI, Space hot checked and ok for furniture set up only. Ceiling ok to cover
Permanent Service12/5/201912/6/201912/6/2019APASS
DetailsJames Ady
Thank you Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Corrections made p/s u/g n ok
Permanent Service12/3/201912/4/201912/4/2019AFAIL
DetailsJames Ady
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE no fault current, no ufer access. Left message for contractor 12/3. Needed grounding bars installed in sub panels. Not all corrections made
Permanent Service12/2/201912/3/201912/3/2019AFAIL
DetailsJames Ady
Thank you.. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE 110.24 Available fault current shall be posted. 250.68A. Connection to grounding electrode shall be accessible. (Mudring needed at ufer. 250.104 A 1 Metal water piping shall be bonded(Fininsh water line connections)
Electrical Rough-In11/8/201911/8/201911/8/2019PPASS
DetailsJames Ady
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Rough in walls only ok to cover
Electrical Rough-In9/17/20199/18/20199/18/2019PPASS
DetailsJames Ady
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE 2in conduit for street light ok to cover
Conference8/13/20198/14/20198/14/2019PCANC
DetailsJames Ady
underground // Chris Phone #: ###-#### needed rough in
Electrical Rough-In8/14/20198/14/20198/14/2019PPASS
DetailsJames Ady
underground // Chris Phone #: ###-#### ufer ok