Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberELE19-03467
StatusIssued
Name NEW LEAF ELECTRIC
Site Address 2236 S LEADVILLE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Install local disconnect for A/C compressor, new upgrade on panel
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Service9/16/20199/17/20199/17/2019PPASS
DetailsRock A. Hudson
Upgrading service, installing an all-in-one meterbox ; breaker panel. Not sure exactly what time we''ll be ready for inspection, but if you want to text/call ahead I can give you a better idea of where we''re at and if we''re ready. Phone #: ###-#### Inspection requested via web by Dan Hilke
p/s o/h rec ok
Conference9/13/20199/13/20199/13/2019PDONE
DetailsJames Ady
I believe that in order to add a circuit for the A/C local disconnect, I''ll likely have to install a new meter box first. Because of the existing conditions (ie. the fuse box, and how the overhead feed comes in) I''d like to get a chance to look at this with an inspector before starting out. Please call so I know when to be there, I''m about 20 minutes away. Phone #: ###-#### Inspection requested via web by Dan Hilke Service change needed. Fuse box is behind a Gas water heater and cannot be refed from All in one. It would change wiring configuration of fuse box from a main to a sub panel. Ok to remuve guts of fuse box and turn into J-box. Screw door closed so splices will not be accessable.