Temporary Service | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact electrician on-site Shawn Evins. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek t/s u/g n ok
|
Temporary Service | 10/4/2019 | 10/7/2019 | 10/7/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Contact electrical on-site Shawn Evins. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 230.95(C)- Ground fault performance test shall be performed on all service disconnecting means rated 150 or more volts to ground and 1000 amps for greater. Informed must have a core and shell permit, when temp power passes that permit automaticly finals out.
|
Electrical Rough-In | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Rock A. Hudson
|
|
|
Contact electrical on-site Shawn Evins. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Ground ring and lightning arrest welds rough in ok cover
|
Electrical Rough-In | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PASS |
Rock A. Hudson
|
|
|
Uffer ground inspection for the Crane Power. Contact Shawn Evins. Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Item noted rough in ok cover
|