Final | 12/6/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Rock A. Hudson
|
|
|
Boise Centre removed their extension cord from the ceiling. Please call Luke if you have any other questions. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Final ok
|
Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Please call Luke for final inspection of Boise Centre entry and security remodel. Please give Luke a 15 minute notice so he can meet you on site. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Work performed checked ok. North central entrance, left column, an extension cord is run up column and into grid ceiling in violation of 400,12- Uses not permitted for flexible cords. BCC 4 05 32- No code violation shall be retained. Once extension cord has been removed recall. final.
|
Electrical Rough-In | 9/20/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Rock A. Hudson
|
|
|
R/I inspection of main entrance, 20A and 50A outlets, remodel style can lights (reason only whips are in hard lid). Contact Luke Hardy Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Main South East entrance walls and lids rough in ok cover
|
Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Rock A. Hudson
|
|
|
R/I inspection of main entrance, 20A and 50A outlets, remodel style can lights (reason only whips are in hard lid). Remainder of project LV/security only Contact Luke Hardy Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek ELE attached to wrong BLD, need BLD19-01465. Contact asked to cancel inspection due to framing not ready for electrical.
|