Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC17-00028
StatusFinaled
Name JASON JONES
Site Address 11818 W JOPLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
New irrigation diversion with headway gate, weir, and pipe for the Graham-Gilbert ditch from the south channel of Boise River to the pond within the Laguna Pointe Subdivision. BMPs include: staging area, stabilized construction entrance, concrete washout, and a fiber wattle along the access road. Ensure channel bank stabilization is reached.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/7/20183/9/20183/12/2018PPASS
DetailsAndy J. Long
enter via Pamela Baker Park.

Work complete for project. No ESC requests or corrections.
Aging Inspection3/6/20183/6/20183/7/2018 CANC
DetailsAndy J. Long
General Inspection1/3/20181/3/20181/3/2018PPASS
DetailsMichael Zawacki
Aging Inspection12/21/201712/21/201712/21/2017 PASS
DetailsMichael Zawacki
Inspected 12-19. No issues.
General Inspection10/20/201710/20/201710/24/2017PCANC
DetailsMichael Zawacki
General Inspection5/24/20175/24/20175/26/2017PCANC
DetailsMelissa Jannusch