Site Final | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Andy J. Long
|
|
|
BLD finaled. Home is landscaped and stabilized. Temp BMP storm drain protection to remain installed for active projects on Barnside.
|
Aging Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | | PASS |
Michael Zawacki
|
|
|
Still not landscaped.
|
Aging Inspection | 2/14/2018 | 2/14/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
Still needs landscaping.
|
Aging Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | | PASS |
Michael Zawacki
|
|
|
Home complete. Yard is still bare dirt and needs landscaping.
|
General Inspection | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior. Trash contained. No trackout. No corrections.
|
Site Preparation | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Melissa Jannusch
|
|
|
John Phone #: ###-#### Project has already started. Called RP and reminded him to call in site preps before work begins. Concrete washout on site, sign is posted. Ensure trash containment is installed. Reminded RP to prevent windblown trash and trackout. Okay to start.
|