General Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 2/13/2018 | 2/13/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
House complete, waiting on stabalization.
|
Random Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is complete. Waiting for final stabalization.
|
General Inspection | 1/17/2018 | 1/17/2018 | 1/17/2018 | | PASS |
Michael Zawacki
|
|
|
Home complete. Waiting for landscaping to establish for final stabalization.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | | PASS |
Michael Zawacki
|
|
|
Home complete. Reseeding on rear hillside.
|
General Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | | PASS |
Michael Zawacki
|
|
|
Landscaping completed. Area looks stable. Neighborhood BMPs still in place, there still are vacant lots.
|
Tracking Control | 11/15/2017 | 11/15/2017 | 11/16/2017 | P | PASS |
Michael Zawacki
|
|
|
Landscapers running skid steer along road and sidewalk. They are planting trees. Talked to lead landscaper and he said they will get the are clean before they leave for the day.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/9/2017 | | PASS |
Michael Zawacki
|
|
|
Exterior of home finished. In process of landscaping.
|
General Inspection | 10/24/2017 | 10/24/2017 | 10/26/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/17/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
Andy J. Long
|
|
|
Larry Kerr Phone #: ###-####
Permit sign posted. Perimeter wattles installed. Adjacent projects on Goshawk are in good condition. No trackout, trash containment provided. EC # 8 BMPs are installed (DI bags, concrete washout). Approved for construction.
|