Site Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Currently acting as a storage yard. Some gravel on sidewalk and street, caused by current work on neighboring properties.
|
Site Preparation | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Melissa Jannusch
|
|
|
Bryan Phone #: ###-#### Sign is posted. Concrete washout pit has been dug RP will line with plastic. Reminded RP to watch for trackout and to contain windblown trash.
|