Site Final | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped/stabilzed. ESC permit conditions satisfied. DI bags on Hakkasan will be pulled upon complete on the last few lots at west end of street.
|
General Inspection | 4/20/2018 | 4/20/2018 | 4/20/2018 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site finishing lots. Home construction completed.
|
General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/21/2018 | 3/21/2018 | 3/21/2018 | | PASS |
Andy J. Long
|
|
|
East Valley sub inspected 3/20; subdivision BMPs implemented. This home not yet complete and stabilized.
|
General Inspection | 3/6/2018 | 3/6/2018 | 3/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/16/2018 | 2/16/2018 | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work complete. Yard still needs landscaping and to be stabalized.
|
General Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Some building waste around homesite. Materials stored on front of lot. No dirt is leaving site.
|
Site Preparation | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
|